单选题An administrator wants to deploy a complex LPAR environment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()A LPAR Planning Tool.B System Planning To

题目
单选题
An administrator wants to deploy a complex LPAR environment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()
A

LPAR Planning Tool.

B

System Planning Tool.

C

LPAR Validation Tool.

D

System Validation Tool.


相似考题
参考答案和解析
正确答案: C
解析: 暂无解析
更多“单选题An administrator wants to deploy a complex LPAR environment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()A LPAR Planning Tool.B System Planning To”相关问题
  • 第1题:

    An administrator has implemented the following LPARs on a Power 570 with 32 GB memory with 512 MB remaining for allocation: LPAR 1 memory : min = 10 GB des = 15 GB max = 24 GB  LPAR 2memory : min = 10 GB des = 15 GB max = 24 GB The administrator receives a request to add 2 GB to LPAR 1. The only way to do this is by moving memory from LPAR 2 to LPAR 1. The administrator attempts to move the memory, but the operation fails. The administrator can  however allocate 512 MB that is free to LPAR 1 on the 570.  What is the most likely cause of this failure when dynamically moving memory?()

    • A、 Maxperm% is set too low on LPAR 2
    • B、 Insufficient paging space on LPAR 1
    • C、 Service IBM.DRM is unavailable on LPAR 1
    • D、 Insufficient pinnable memory frames available on LPAR 2

    正确答案:D

  • 第2题:

    Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()

    • A、Use AIX 5.3 which supports micro-partitioning for both the test and training LPARS
    • B、Use DLPAR to move resources from the test LPAR to training when training is active
    • C、Install Partition Load Manager to share resources between the test and training environments
    • D、Install Advanced Power Virtualization and then use micro-partitioning for both the test and  training LPARs

    正确答案:D

  • 第3题:

    An administrator wants to deploy a complex LPARenvironment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()

    • A、LPAR Planning Tool.
    • B、System Planning Tool.
    • C、LPAR Validation Tool.
    • D、System Validation Tool.

    正确答案:B

  • 第4题:

    What type of configuration can provide the best availability in a Virtual IO Server environment?()

    • A、Provide multiple paths to all resources through 2 or more Virtual IO Servers
    • B、Mirror all disk resources on the Virtual IO Server to present to the client LPAR
    • C、Mirror all disk resources on the client LPAR to the shared SCSI on the Virtual IO Server
    • D、Trunk multiple Ethernet adapters on the Virtual IO Server to a single Shared Ethernet Adapter (SEA)

    正确答案:A

  • 第5题:

    During the pre-installation planning of a customer’s recently purchased IBM System Storage DS8700 the port configuration, cabling, and disk layout were discussed.  What other topic should be discussed in this solution review()

    • A、LPAR capacity planning
    • B、logical volume configuration
    • C、data migration process
    • D、audit hosts for HBA worldwide port names

    正确答案:C

  • 第6题:

    单选题
    When planning for a logically partitioned system,which of the following should be used as part of a review to ensure that each partition has the required resources? ()
    A

    Use the Workload Estimator capacity planning tool.

    B

    Use prtconf output from legacy systems.

    C

    Use the LPAR Validation Tool.

    D

    Use Performance Management Services.


    正确答案: A
    解析: 暂无解析

  • 第7题:

    单选题
    An administrator has implemented the following LPARs on a Power 570 with 32 GB memory with 512 MB remaining for allocation: LPAR 1 memory : min = 10 GB des = 15 GB max = 24 GB  LPAR 2memory : min = 10 GB des = 15 GB max = 24 GB The administrator receives a request to add 2 GB to LPAR 1. The only way to do this is by moving memory from LPAR 2 to LPAR 1. The administrator attempts to move the memory, but the operation fails. The administrator can  however allocate 512 MB that is free to LPAR 1 on the 570.  What is the most likely cause of this failure when dynamically moving memory?()
    A

     Maxperm% is set too low on LPAR 2

    B

     Insufficient paging space on LPAR 1

    C

     Service IBM.DRM is unavailable on LPAR 1

    D

     Insufficient pinnable memory frames available on LPAR 2


    正确答案: C
    解析: 暂无解析

  • 第8题:

    单选题
    What type of configuration can provide the best availability in a Virtual IO Server environment?()
    A

    Provide multiple paths to all resources through 2 or more Virtual IO Servers

    B

    Mirror all disk resources on the Virtual IO Server to present to the client LPAR

    C

    Mirror all disk resources on the client LPAR to the shared SCSI on the Virtual IO Server

    D

    Trunk multiple Ethernet adapters on the Virtual IO Server to a single Shared Ethernet Adapter (SEA)


    正确答案: D
    解析: 暂无解析

  • 第9题:

    单选题
    An administrator wants to deploy a complex LPAR environment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()
    A

    LPAR Planning Tool.

    B

    System Planning Tool.

    C

    LPAR Validation Tool.

    D

    System Validation Tool.


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    A resource was dynamically assigned to an LPAR. The customer wants to make the assignment permanent.  What does the technical specialist need to do to reconfigure the LPARs to make the assignment permanent?()
    A

    Reboot the source LPAR.

    B

    Remove the resource from the source LPAR.

    C

    Rediscover the managed system from the HMC.

    D

    Add the resource to the profile of the LPAR.


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    A System p customer is planning to implement virtualization and is concerned about how to respond  to an increased workload and what limitations there are for very small workloads.  Which of the following describes the minimum size for an LPAR and the minimum amount that can be transferred from on LPAR to another()
    A

    Smallest partition 10% of all available processors, as small as 1% of all available processors may be transferred.

    B

    Smallest partition 10% of a processor, as small 1% of a processor may be transferred.

    C

    Smallest partition one processor, as small 1% of a processor may be transferred.

    D

    Smallest partition one core, as small 10% of a processor may be transferred.


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()
    A

    Use AIX 5.3 which supports micro-partitioning for both the test and training LPARS

    B

    Use DLPAR to move resources from the test LPAR to training when training is active

    C

    Install Partition Load Manager to share resources between the test and training environments

    D

    Install Advanced Power Virtualization and then use micro-partitioning for both the test and  training LPARs


    正确答案: D
    解析: 暂无解析

  • 第13题:

    Companycom has a p5 590 that has their production LPAR, their Tivoli Storage Manager (TSM) LPAR, and several other LPARs. What method would provide connectivity between the production LPAR, and the TSM LPAR, but be isolated from the other LPARs in the system without utilizing a Virtual IO Server or physical adapter resources?()

    • A、Use shared memory and semaphores to transfer the data to the TSM LPAR
    • B、Provide gigabit Ethernet adapters in each LPAR and run a crossover cable
    • C、Create a Virtual Ethernet between the production server and the TSM LPARs
    • D、Create a Virtual Ethernet between the TSM server LPAR and the non-production LPARs

    正确答案:C

  • 第14题:

    A System p customer is planning to implement virtualization and is concerned about how to respond  to an increased workload and what limitations there are for very small workloads.  Which of the following describes the minimum size for an LPAR and the minimum amount that can be transferred from on LPAR to another()

    • A、Smallest partition 10% of all available processors, as small as 1% of all available processors may be transferred.
    • B、Smallest partition 10% of a processor, as small 1% of a processor may be transferred.
    • C、Smallest partition one processor, as small 1% of a processor may be transferred.
    • D、Smallest partition one core, as small 10% of a processor may be transferred.

    正确答案:B

  • 第15题:

    An administrator wants to deploy a complex LPAR environment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()

    • A、LPAR Planning Tool.
    • B、System Planning Tool.
    • C、LPAR Validation Tool.
    • D、System Validation Tool.

    正确答案:B

  • 第16题:

    A resource was dynamically assigned to an LPAR. The customer wants to make the assignment permanent.  What does the technical specialist need to do to reconfigure the LPARs to make the assignment permanent?()

    • A、Reboot the source LPAR.
    • B、Remove the resource from the source LPAR.
    • C、Rediscover the managed system from the HMC.
    • D、Add the resource to the profile of the LPAR.

    正确答案:D

  • 第17题:

    System configurations on the HMC have been backed up correctly. After a restore, the partitions are defined with different characteristics than the running systems. What is the most probable cause of this problem?()

    • A、The LPAR Configuration backup is corrupt
    • B、The LPAR Configuration has been altered using DLPAR
    • C、The LPAR Configuration backup was performed on a different HMC
    • D、The LPAR Configuration has been altered through the Advanced System Management Interface (ASMI) on the server after the backup was performed

    正确答案:B

  • 第18题:

    单选题
    Companycom LPAR that is using a Virtual IO Server needs to be more highly available. How can this be accomplished using APV features?()
    A

    Reallocate the Virtual IO Server disks to the user LPAR

    B

    Create a stripe-group within the Virtual IO Server to protect against disk failure

    C

    Reconfigure the user LPAR to use both locally owned disk and a Virtual SCSI disk

    D

    Create a second Virtual IO Server and reconfigure the user LPAR to mirror across both Virtual IO  Servers


    正确答案: B
    解析: 暂无解析

  • 第19题:

    单选题
    Company.com wants to put two Micro-Partitions on a p5-570 and attach to a SAN. What is the best LPAR configuration to maximize SAN availability using four Host Bus Adapters (HBAs)?()
    A

    Two HBAs assigned to each redundant VIOS which provides VSCSI access to LUNs

    B

    Two HBAs assigned to each LPAR with each LPAR owning HBAs on the same PCI busses

    C

    Two HBAs assigned to each LPAR with each LPAR owning HBAs on separate PCI busses

    D

    One HBA assigned to each LPAR and two HBAs assigned to a VIOS providing VSCSI access to LUNs


    正确答案: D
    解析: 暂无解析

  • 第20题:

    单选题
    System configurations on the HMC have been backed up correctly. After a restore, the partitions are defined with different characteristics than the running systems. What is the most probable cause of this problem?()
    A

    The LPAR Configuration backup is corrupt

    B

    The LPAR Configuration has been altered using DLPAR

    C

    The LPAR Configuration backup was performed on a different HMC

    D

    The LPAR Configuration has been altered through the Advanced System Management Interface (ASMI) on the server after the backup was performed


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    Companycom has a p5 590 that has their production LPAR, their Tivoli Storage Manager (TSM) LPAR, and several other LPARs. What method would provide connectivity between the production LPAR, and the TSM LPAR, but be isolated from the other LPARs in the system without utilizing a Virtual IO Server or physical adapter resources?()
    A

    Use shared memory and semaphores to transfer the data to the TSM LPAR

    B

    Provide gigabit Ethernet adapters in each LPAR and run a crossover cable

    C

    Create a Virtual Ethernet between the production server and the TSM LPARs

    D

    Create a Virtual Ethernet between the TSM server LPAR and the non-production LPARs


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    Which command should the administrator use to display the IPL progress/LED code of the partition?()
    A

    lsled -m System -r lpar 

    B

    lsrefcode -m System -r lpar 

    C

    lshwinfo -m System -r led_code 

    D

    lssyscfg -m System -r sys -F lpar_name,led_code


    正确答案: C
    解析: 暂无解析

  • 第23题:

    单选题
    Companycom is planning a p5 595 running AIX 5L 5.3 LPARs. They would like to design the system using physical resources with maximum resource efficiency. One LPAR requires a peak load of 30 processors during the week with a low of 1 processor required on the weekend. The other LPAR requires only a single processor most of the time, but needs at least 24 processors at the beginning of the weekend to finish its weekly processing in the window allocated. Which of the following solutions is most appropriate to continuously maximize resource use for these two LPARs?()
    A

    Dynamic LPAR

    B

    Workload Manager

    C

    Partition Load Manager

    D

    Shared Processor Pools


    正确答案: C
    解析: 暂无解析

  • 第24题:

    单选题
    An administrator wants to deploy a complex LPARenvironment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()
    A

    LPAR Planning Tool.

    B

    System Planning Tool.

    C

    LPAR Validation Tool.

    D

    System Validation Tool.


    正确答案: C
    解析: 暂无解析