单选题While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?

题目
单选题
While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?()
A

IBM DS5000 Cabling Tool

B

IBM e-Configurator Tool

C

IBM Pre-Installation TDA Checklist

D

IBM Standalone Solutions Configuration Tool


相似考题
更多“单选题While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?”相关问题
  • 第1题:

    An IBM XIV system with nine modules and 2 TB disks is being proposed to a customer who needs to increase disk capacity in the data center. The customer is concerned about data growth andcost after the initial purchase. Which of the following factors of the solution should be stressed to the customer to address data growth?()

    • A、the XIV system can be scaled by the addition of modules
    • B、XIV offers thin provisioning for all available host operating systems
    • C、reduced operating costs will pay for another XIV system in less than two years
    • D、the management GUI allows the administrator tovirtualize the entire storage system quickly

    正确答案:A

  • 第2题:

    A customer has installed an IBM System Storage DS8700 with 20 TB of storage, two-way processor version, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues.  To address this performance consideration with minimal cost to the customer, which of the following should be the FIRST step to resolve the problem()

    • A、add an expansion frame with additionalFibre Channel ports
    • B、increase the amount of storage by 20 TB
    • C、conduct a Disk Magic study to identify the source of the performance issue
    • D、add additionalFibre Channel ports to the existing DS8700

    正确答案:C

  • 第3题:

    A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()

    • A、A solution sizing questionnaire
    • B、Verify the customer has the proper racks
    • C、A Technical Delivery Assessment
    • D、Verify the customer has enough cooling in the computer room

    正确答案:C

  • 第4题:

    A customer has installed an IBM System Storage DS8700 with 20 TB of storage, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues since they have added new workloads. The customer asks the storage specialist for guidance. Which of the following actions should be recommended as a first step?()

    • A、install the Performance Accelerator feature
    • B、review the DS Storage Manager Major Event Log (MEL)
    • C、add an expansion frame with additionalFibre Channel ports
    • D、review the latest TPC for Disk study to identify the source of the performance issue

    正确答案:D

  • 第5题:

    A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch.Which of the following should be mentioned to the customer regarding the NPIV switch?()

    • A、You can not use an NPIV switch in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch 
    • B、Using blade servers with the NPIV switch will require more fibre ports on the external fibre switch 
    • C、Storage devices like Fibre Channel Tape and Disk cannot be attached to the NPIV Switch but must connect to a core fabric switch
    • D、The NPIV switch will count against the number of domains in a fabric

    正确答案:C

  • 第6题:

    A customer purchased a new IBM xSeries x445.  They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server.  The rack houses an existing UPS unit for the entire rack.  Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()

    • A、Have optional Fibre Channel and Ethernet switches been installed in the server?
    • B、What is the available kVA value of the UPS?
    • C、Are there sufficient empty socket outlets in the UPS?
    • D、What is the impact on the power consumption of the data center cooling system?

    正确答案:B

  • 第7题:

    单选题
    A customer is looking to add disk storage. They are not satisfied with their existing EMCCLARiiON CX4-240. Instead of adding storage to the CX4, the customer wants to add a newsystem and migrate the LUNs from the EMC to the new storage system over a 6 month period,and not have any system disruption during this time. They are also interested in consolidating diskstorage management. Given these specifications, which of the following solutions would satisfythis customer’s requirements?()
    A

    DS5100 and SAN Volume Controller

    B

    DS5100 and Tivoli Storage Manager

    C

    2 DS5100 systems with Remote Mirroring

    D

    DS5100 and Tivoli Storage Productivity Center for Data


    正确答案: B
    解析: 暂无解析

  • 第8题:

    单选题
    A customer has installed an IBM System Storage DS8700 with 20 TB of storage, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues since they have added new workloads. The customer asks the storage specialist for guidance. Which of the following actions should be recommended as a first step?()
    A

    install the Performance Accelerator feature

    B

    review the DS Storage Manager Major Event Log (MEL)

    C

    add an expansion frame with additionalFibre Channel ports

    D

    review the latest TPC for Disk study to identify the source of the performance issue


    正确答案: D
    解析: 暂无解析

  • 第9题:

    单选题
    An industrial sector customer has requested an IBM System x3755 for a high performance computing application. Pricing is the most sensitive decision factor for this customer. They are looking for an entry-level storage solution because the application needs to access about 12 TB of data, with an expected future growth of 10-15 percent. As this is the only server accessing this amount of data, the customer does not want to have a SAN.  What should the System x Sales Specialist recommend? ()
    A

    DS3300 iSCSI-based solution

    B

    One MegaRAID 8480 card with four EXP3000 units

    C

    DS4000 Fibre Channel solution with EXP810 expansion units

    D

    DS3400 Fibre Channel solutionWArialZ


    正确答案: A
    解析: 暂无解析

  • 第10题:

    单选题
    While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?()
    A

    IBM DS5000 Cabling Tool

    B

    IBM e-Configurator Tool

    C

    IBM Pre-Installation TDA Checklist

    D

    IBM Standalone Solutions Configuration Tool


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()
    A

    The room temperature has reached 23C (73.4F). 

    B

    A Blade within the chassis has been shut down. 

    C

    The ambient temperature in the data center has increased 

    D

    One of the additional System X servers in the BladeCenter rack has failed.


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    A customer has installed an IBM System Storage DS8700 with 20 TB of storage, two-way processor version, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues.  To address this performance consideration with minimal cost to the customer, which of the following should be the FIRST step to resolve the problem()
    A

    add an expansion frame with additionalFibre Channel ports

    B

    increase the amount of storage by 20 TB

    C

    conduct a Disk Magic study to identify the source of the performance issue

    D

    add additionalFibre Channel ports to the existing DS8700


    正确答案: B
    解析: 暂无解析

  • 第13题:

    A customer is interested in purchasing a new IBM System Storage DS8000 solution to consolidateolder ESS and F20 storage systems. What should be done first, prior to final proposaldevelopment?()

    • A、perform a Disk Magic study 
    • B、review eConfig with a technical specialist 
    • C、confirm that the customer has enough ports available in the SAN infrastructure 
    • D、submit configuration to IBM System Storage Interoperability Center for validation

    正确答案:A

  • 第14题:

    While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?()

    • A、IBM DS5000 Cabling Tool
    • B、IBM e-Configurator Tool
    • C、IBM Pre-Installation TDA Checklist
    • D、IBM Standalone Solutions Configuration Tool

    正确答案:C

  • 第15题:

    A small bio-tech company is interested in implementing an IBM System Storage solution. Which ofthe following tools can be used to help justify the cost of our solution to a customer?()

    • A、TCOnow
    • B、Disk Magic 
    • C、Capacity Magic 
    • D、System Storage Productivity Center (SSPC)

    正确答案:A

  • 第16题:

    A customer has the need for performance monitoring of an IBM System Storage DS8000.  Which product does the customer need()

    • A、System Storage Productivity Center
    • B、Tivoli Storage Productivity Center for Data
    • C、Tivoli Storage Productivity Center for Disk
    • D、Tivoli Storage Productivity Center for Fabric

    正确答案:C

  • 第17题:

    A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble. Which resource should be consulted while developing the solution options?()

    • A、Disk Magic
    • B、TPC for Data
    • C、CLARiiON Procedure Generator
    • D、System Storage Interoperability Center

    正确答案:D

  • 第18题:

    An industrial sector customer has requested an IBM System x3755 for a high performance computing application. Pricing is the most sensitive decision factor for this customer. They are looking for an entry-level storage solution because the application needs to access about 12 TB of data, with an expected future growth of 10-15 percent. As this is the only server accessing this amount of data, the customer does not want to have a SAN.  What should the System x Sales Specialist recommend? ()

    • A、DS3300 iSCSI-based solution
    • B、One MegaRAID 8480 card with four EXP3000 units
    • C、DS4000 Fibre Channel solution with EXP810 expansion units
    • D、DS3400 Fibre Channel solutionWArialZ

    正确答案:B

  • 第19题:

    单选题
    An IBM XIV system with nine modules and 2 TB disks is being proposed to a customer who needs to increase disk capacity in the data center. The customer is concerned about data growth andcost after the initial purchase. Which of the following factors of the solution should be stressed to the customer to address data growth?()
    A

    the XIV system can be scaled by the addition of modules

    B

    XIV offers thin provisioning for all available host operating systems

    C

    reduced operating costs will pay for another XIV system in less than two years

    D

    the management GUI allows the administrator tovirtualize the entire storage system quickly


    正确答案: A
    解析: 暂无解析

  • 第20题:

    单选题
    A small bio-tech company is interested in implementing an IBM System Storage solution. Which ofthe following tools can be used to help justify the cost of our solution to a customer?()
    A

    TCOnow

    B

    Disk Magic 

    C

    Capacity Magic 

    D

    System Storage Productivity Center (SSPC)


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    A customer purchased a new IBM xSeries x445.  They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server.  The rack houses an existing UPS unit for the entire rack.  Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()
    A

    Have optional Fibre Channel and Ethernet switches been installed in the server?

    B

    What is the available kVA value of the UPS?

    C

    Are there sufficient empty socket outlets in the UPS?

    D

    What is the impact on the power consumption of the data center cooling system?


    正确答案: A
    解析: 暂无解析

  • 第22题:

    单选题
    A customer is interested in purchasing a new IBM System Storage DS8000 solution to consolidateolder ESS and F20 storage systems. What should be done first, prior to final proposaldevelopment?()
    A

    perform a Disk Magic study 

    B

    review eConfig with a technical specialist 

    C

    confirm that the customer has enough ports available in the SAN infrastructure 

    D

    submit configuration to IBM System Storage Interoperability Center for validation


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()
    A

    A solution sizing questionnaire

    B

    Verify the customer has the proper racks

    C

    A Technical Delivery Assessment

    D

    Verify the customer has enough cooling in the computer room


    正确答案: C
    解析: 暂无解析

  • 第24题:

    单选题
    A customer has the need for performance monitoring of an IBM System Storage DS8000.  Which product does the customer need()
    A

    System Storage Productivity Center

    B

    Tivoli Storage Productivity Center for Data

    C

    Tivoli Storage Productivity Center for Disk

    D

    Tivoli Storage Productivity Center for Fabric


    正确答案: A
    解析: 暂无解析