Voltage
Frequency
Power Source Loading (max)
Power Source Loading (typical)
第1题:
A customer wants to install a pSeries system into an OEM rack. What critical information is provided in the Site and Hardware Planning Information manual?()
第2题:
A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers. This is the first p650 in the enterprise. What is the most important question that the pSeries technical specialist should ask the customer before the order is placed?()
第3题:
A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system. How might the pSeries technical specialist aid the customer in addressing their concern?()
第4题:
A company has recently placed an order for a POWER4+ p650 server. Their facilities manager has approached the pSeries technical specialist to gather information on the correct power receptacle for thenew server. They have requested a picture of the power cord plug to show to their electrician. Where would the pSeries technical specialist find the required information?()
第5题:
Companycom is moving their application to a p5 590 and at the same time moving to a new version of the application. The customer knows only about the resource requirements of the old version. Which of the following is the best method to migrate their application to POWER5?()
第6题:
Sales Manual
Announcement Letter
POWER4+ p650 Specification Sheet
Site and Hardware Planning Information Manual
第7题:
Voltage
Frequency
Power Source Loading (max)
Power Source Loading (typical)
第8题:
Direct the customer to the Installation Guide for each system to identify the power requirements.
Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.
Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.
Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.
第9题:
WLDF has better performance than OEM
my organization already has a solution for unified management and monitoring; we need to supplement that with some specific WLS-related capabilities
OEM is not certified with latest version of WLS
OEM is really focused on the database tier, is not meant to address JEE management and monitoring
第10题:
Disk usage will increase in proportion to memory.
The new database will demand much more memory.
Memory demand will increase 10% for the next year.
Processor demand will increase about 10% for the next year.
第11题:
Add CPU and memory COD so they have room to grow if required
Make the server configuration twice as large as the current requirement
Configure the server for the current capacity requirements
Make the server configuration a little larger than the current capacity requirements
第12题:
Because additional systems would require more power receptacles
Because the customer may need to do additional facilities planning
Because the customer needs additional funding to cover the services
Because postponing the eventual discussion will likely lead to customer dissatisfaction
第13题:
Which of the following would be the BEST location to research current physical layout?()
第14题:
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()
第15题:
A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers. They have four identical new applications each requiring a minimum of seven processors and 96GB of memory. Which solution would best meet the customer’s requirements?()
第16题:
A customer has several small AIX applications that are expected to grow over the next several years. The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth. They are also concerned about the under-utilization of their IT resources. What should the pSeries technical specialist recommend to address this challenge?()
第17题:
Add External Storage via EXP3000
Replace current storage with more dense drives
Add External Storage via SAN
Add storage expansion blade
第18题:
Two p670 servers
Four p650 servers
Two p5-570 servers
Four p5-550 servers
第19题:
OEM website
Software logs
Baseline documentation
Pre-installation plans
第20题:
System dimensions and weight, system power and cooling requirements, and list of supported OEM racks
System dimensions and weight, list of supported OEM racks, and requirements for installing IBM systems into OEM racks
System performance specs, system power and cooling requirements, and requirements for installing IBM systems into OEM racks
System dimensions and weight, system power and cooling requirements, and requirements for installingIBM systems into OEM racks
第21题:
Have the PDU requirements been met?
Are there sufficient KVM connections?
Is there sufficient service clearance?
Is there sufficient space in the existing rack?
第22题:
What are the plans for Disaster Recovery?
What are the plans for data migration?
Would iSCSI meet your needs?
How much space is available in the current storage systems?
第23题:
edit
systeminfo
gpedit.msc
dxdiag
第24题:
Install a p615 per application.
Install a p650 with AIX 5.2 and dynamic LPAR and CUoD.
Install the appropriate solution once the requirements are understood.
Install a POWER5 system with AIX 5.3, Advanced POWER Virtualization, and CoD.