单选题What is a key advantage of the POWER5 technology over all other competitive offerings?()A POWER5 supports multiple operating systems.B POWER5 supports more nodes in a clustered environment.C POWER5 hypervisor has significantly less overhead than hardwa

题目
单选题
What is a key advantage of the POWER5 technology over all other competitive offerings?()
A

POWER5 supports multiple operating systems.

B

POWER5 supports more nodes in a clustered environment.

C

POWER5 hypervisor has significantly less overhead than hardware partitioning.

D

POWER5 has greater granularity of resources such as memory, processors and I/O.


相似考题
更多“单选题What is a key advantage of the POWER5 technology over all other competitive offerings?()A POWER5 supports multiple operating systems.B POWER5 supports more nodes in a clustered environment.C POWER5 hypervisor has significantly less overhead than hardwa”相关问题
  • 第1题:

    A customer has an EMC Symmetrix DMX-4 installed. The disk subsystem is coming off lease. The customer is considering an IBM System Storage DS8800.  What is a key advantage of the  DS8800()

    • A、The DS8800 has a higher disk RPM than the Symmetrix DMX-4
    • B、The DS8800 has higher capacity with more efficient footprint than the Symmetrix DMX-4
    • C、The DS8800 supports FlashCopy for internal array replication
    • D、The DS8800 supports external virtualization

    正确答案:B

  • 第2题:

    What is a key advantage of the POWER5 technology over all other competitive offerings?()

    • A、POWER5 supports multiple operating systems.
    • B、POWER5 supports more nodes in a clustered environment.
    • C、POWER5 hypervisor has significantly less overhead than hardware partitioning.
    • D、POWER5 has greater granularity of resources such as memory, processors and I/O.

    正确答案:D

  • 第3题:

    Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()

    • A、Include a new HMC in the order to connect to the p5 595
    • B、Include a pair of new HMCs in the order to connect to the p5 595
    • C、Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilities
    • D、Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to  POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities

    正确答案:B

  • 第4题:

    A client has an existing p5 570 that is directly connected to a HMC. The customer will be purchasing another p5 570. Which of the following solutions would be appropriate to provide HMC connectivity to the second p5 570?()

    • A、Implement a proxy server to provide multiple sources to one destination 
    • B、Purchase an additional Ethernet adapter for each p5 570 to provide connectivity between the two 
    • C、Purchase a network hub or switch so both p5 570s can connect to the single HMC 
    • D、Purchase an additional HMC since multiple HMC are required when more than one POWER5 Enterprise class server is used Purchase an additional HMC since multiple HMC? are required when more than one POWER5 Enterprise class server is used

    正确答案:C

  • 第5题:

    A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()

    • A、A desk, as it not rack mountable
    • B、Ethernet connections to the POWER5 systems
    • C、Serial connections to the POWER5 systems
    • D、USB connections for the keyboard and mouse

    正确答案:B

  • 第6题:

    单选题
    Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()
    A

    Order a POWER5 HMC

    B

    Connect to the existing HMC

    C

    Install an 8-port asynchronous card in the managed server to connect to the existing HMC

    D

    Install an additional network card to the existing HMC and connect to the POWER5 service processor


    正确答案: B
    解析: 暂无解析

  • 第7题:

    单选题
    Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()
    A

    Include a new HMC in the order to connect to the p5 595

    B

    Include a pair of new HMCs in the order to connect to the p5 595

    C

    Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilities

    D

    Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to  POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities


    正确答案: B
    解析: 暂无解析

  • 第8题:

    单选题
    A customer plans to consolidate to high-end enterprise level servers using multiple partitions.  They are evaluating an IBM POWER5 solution for their server consolidation environment.  Which of the following best describes the value of the IBM solution as compared with the competition?()
    A

    The POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.

    B

    The POWER5 system supports more partitions, processors, and memory than any competitor’s solution.

    C

    The POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.

    D

    The POWER5 system supports more partitions and has the lowest partitioning overhead.


    正确答案: D
    解析: 暂无解析

  • 第9题:

    单选题
    What is an advantage of IBM SAN Volume Controller (SVC) virtualization over an HP EnterpriseVirtual Array virtualization?()
    A

    SVC supports more RAID levels than HP EVA

    B

    SVC has a broader worldwide installation base than HP EVA

    C

    SVC provides SAN virtualization within the storage area network

    D

    SVC is an IBM virtualization solution for IBM disks in an HP EVA


    正确答案: D
    解析: 暂无解析

  • 第10题:

    多选题
    What two descriptions best define DWDM? ()
    A

    a WDM system that is compatible with EDFA technology

    B

    an optical technology for transmitting up to 16 channels over multiple fiber strands

    C

    an optical technology for transmitting up to 32 channels over multiple fiber strands

    D

    a technology for transmitting multiple optical signals using less sophisticated transceiver designthen CWDM

    E

    a technology for transmitting more closely packed optical signals using more sophisticatedtransceiver designs than CWDM


    正确答案: B,A
    解析: 暂无解析

  • 第11题:

    单选题
    Which of the following is a reason to implement a local KVM instead of an IP KVM?()
    A

     Local KVM supports all operating systems.

    B

     Local KVMs allow multiple user access.

    C

     Higher number of ports on a local KVM.

    D

     Local KVMs are more secure.


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    What is the minimum version of POWER architecture which supports capped and uncapped partitions in the same shared processor pool?()
    A

     POWER4 

    B

     POWER5 

    C

     POWER6 

    D

     POWER5+


    正确答案: C
    解析: 暂无解析

  • 第13题:

    Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()

    • A、POWER5 runs in an SMP mode as default
    • B、POWER5 can run in a full system mode the same as the p690
    • C、POWER5 can run in full system mode with the purchase of PLM
    • D、POWER5 can run in a full system mode, but it is in LPAR mode

    正确答案:D

  • 第14题:

    A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility.  Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()

    • A、 PowerVM Standard Edition on POWER6 hardware
    • B、 PowerVM Standard Edition with POWER5 hardware 
    • C、 PowerVM Enterprise Edition with POWER6 hardware
    • D、 PowerVM Enterprise Edition with POWER5 hardware

    正确答案:C

  • 第15题:

    A customer has a new Power 720 with PowerVM Standard Edition.  They plan to migrate their single-partition POWER5 550 to the new Power 720.   How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()

    • A、Perform Live Partition Mobility between the two systems.
    • B、Move the boot disks from the old system to the new system.
    • C、Use Tivoli Storage Manager to back up the POWER5 550 and restore on the Power 720.
    • D、Upgrade AIX to the latest level on the POWER5 550 and clone using the mksysb command.

    正确答案:D

  • 第16题:

    What is the minimum version of POWER architecture which supports capped and uncapped partitions in the same shared processor pool?()

    • A、 POWER4 
    • B、 POWER5 
    • C、 POWER6 
    • D、 POWER5+

    正确答案:B

  • 第17题:

    A customer plans to consolidate to high-end enterprise level servers using multiple partitions.  They are evaluating an IBM POWER5 solution for their server consolidation environment.  Which of the following best describes the value of the IBM solution as compared with the competition?()

    • A、The POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.
    • B、The POWER5 system supports more partitions, processors, and memory than any competitor’s solution.
    • C、The POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.
    • D、The POWER5 system supports more partitions and has the lowest partitioning overhead.

    正确答案:A

  • 第18题:

    单选题
    A customer has an EMC Symmetrix DMX-4 installed. The disk subsystem is coming off lease. The customer is considering an IBM System Storage DS8800.  What is a key advantage of the  DS8800()
    A

    The DS8800 has a higher disk RPM than the Symmetrix DMX-4

    B

    The DS8800 has higher capacity with more efficient footprint than the Symmetrix DMX-4

    C

    The DS8800 supports FlashCopy for internal array replication

    D

    The DS8800 supports external virtualization


    正确答案: C
    解析: 暂无解析

  • 第19题:

    单选题
    A client has an existing p5 570 that is directly connected to a HMC. The customer will be purchasing another p5 570. Which of the following solutions would be appropriate to provide HMC connectivity to the second p5 570?()
    A

    Implement a proxy server to provide multiple sources to one destination 

    B

    Purchase an additional Ethernet adapter for each p5 570 to provide connectivity between the two 

    C

    Purchase a network hub or switch so both p5 570s can connect to the single HMC 

    D

    Purchase an additional HMC since multiple HMC are required when more than one POWER5 Enterprise class server is used Purchase an additional HMC since multiple HMC? are required when more than one POWER5 Enterprise class server is used


    正确答案: B
    解析: 暂无解析

  • 第20题:

    单选题
    What is a key advantage of the POWER5 technology over all other competitive offerings?()
    A

    POWER5 supports multiple operating systems.

    B

    POWER5 supports more nodes in a clustered environment.

    C

    POWER5 hypervisor has significantly less overhead than hardware partitioning.

    D

    POWER5 has greater granularity of resources such as memory, processors and I/O.


    正确答案: A
    解析: 暂无解析

  • 第21题:

    单选题
    A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility.  Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()
    A

     PowerVM Standard Edition on POWER6 hardware

    B

     PowerVM Standard Edition with POWER5 hardware 

    C

     PowerVM Enterprise Edition with POWER6 hardware

    D

     PowerVM Enterprise Edition with POWER5 hardware


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    A customer has a new Power 720 with PowerVM Standard Edition.  They plan to migrate their single-partition POWER5 550 to the new Power 720.   How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()
    A

    Perform Live Partition Mobility between the two systems.

    B

    Move the boot disks from the old system to the new system.

    C

    Use Tivoli Storage Manager to back up the POWER5 550 and restore on the Power 720.

    D

    Upgrade AIX to the latest level on the POWER5 550 and clone using the mksysb command.


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    An account executive is preparing for an initial one-on-one meeting with a high-level executive who recently read about POWER5 technology.  The account executive needs technical assistance to prepare for the meeting.  How can a pSeries technical specialist best provide assistance in this situation?()
    A

    Create a POWER5 technical presentation for the account executive’s use.

    B

    Mentor the account executive with the most important POWER5 features and benefits.

    C

    Attend the meeting instead of the account executive to present the POWER5 features and benefits.

    D

    Join the meeting via teleconference at a prescheduled time to present the POWER5 features and benefits.


    正确答案: A
    解析: 暂无解析

  • 第24题:

    单选题
    A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()
    A

    A desk, as it not rack mountable

    B

    Ethernet connections to the POWER5 systems

    C

    Serial connections to the POWER5 systems

    D

    USB connections for the keyboard and mouse


    正确答案: A
    解析: 暂无解析