Submit an RPO-MES to add the missing 2-way processor card.
Submit an MES order to add the missing 2-way processor card.
Request VPD from the customer and then submit an RPO-MES request.
Request VPD from the customer and then submit an MES order to add the missing 2-way processor card.
第1题:
A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers. This is the first p650 in the enterprise. What is the most important question that the pSeries technical specialist should ask the customer before the order is placed?()
第2题:
A customer wants to upgrade their existing 6-way p650 to an 8-way. The installed inventory shows the p650 as only a 4-way. What should the pSeries technical specialist do in order to best correct IBMinventory records? ()
第3题:
The pSeries technical specialist has been invited to a briefing on the latest POWER technology as a representative of their team. What should the specialist offer to do upon return from class in order to best prepare the rest of the team for the introduction of the new technology?()
第4题:
A customer is ready to order a pSeries solution. However, the pSeries technical specialist is unsure whether the customer preferred the fibre channel or the external SCSI disk attachment option. What is the most appropriate action for the specialist to take next?()
第5题:
The pSeries technical specialist is concerned that the installed inventory for a p670 does not match what the customer says is installed. The specialist discovers that the customer has never updated their VPD. Which of the following HMC applications is used to gather the current VPD information?()
第6题:
A company has recently placed an order for a POWER4+ p650 server. Their facilities manager has approached the pSeries technical specialist to gather information on the correct power receptacle for thenew server. They have requested a picture of the power cord plug to show to their electrician. Where would the pSeries technical specialist find the required information?()
第7题:
Include a new HMC in the order to connect to the p5 595
Include a pair of new HMCs in the order to connect to the p5 595
Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilities
Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities
第8题:
Archive the materials in the team’s library.
Act as the sole technical resource for the team.
Summarize the information and make it available to the team.
Evaluate the class and recommend attendance to other team members.
第9题:
Sales Manual
Announcement Letter
POWER4+ p650 Specification Sheet
Site and Hardware Planning Information Manual
第10题:
Linux will be restricted to the p650 system, as it is not supported on the p630.
The customer can run Linux on all the existing systems with or without the presence of AIX.
Linux can run in LPARs on the existing systems but Linux will require the presence of AIX in at least one LPAR.
Linux can be installed on all existing systems but will require the AIX Linux Affinity libraries to boot the systems and run Linux.
第11题:
Submit an RPO-MES to add the missing 2-way processor card.
Submit an MES order to add the missing 2-way processor card.
Request VPD from the customer and then submit an RPO-MES request.
Request VPD from the customer and then submit an MES order to add the missing 2-way processor card.
第12题:
Because additional systems would require more power receptacles
Because the customer may need to do additional facilities planning
Because the customer needs additional funding to cover the services
Because postponing the eventual discussion will likely lead to customer dissatisfaction
第13题:
A customer wants to upgrade an existing pSeries system. In addition to retrieving the IBM configuration records, what else should be done to ensure an accurate upgrade quote is provided?()
第14题:
A customer is having problems after an AIX version upgrade from 5.2 to 5.3. Which of the following should the pSeries technical specialist recommend that the customer call?()
第15题:
A customer with p615, p630 and p650 pSeries servers installed and running AIX is considering Linux as an additional environment. Which Linux capabilities can the pSeries Sales Specialist present as choices that are available to enhance the existing systems?()
第16题:
Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()
第17题:
A customer currently has five partitioned POWER4 systems and is adding new systems. When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()
第18题:
Is there a need for a PKI Management System?
Is there a need for end-to-end encryption?
Do they currently have a Kerberos domain in place?
Which clients are installed on their desktops -- SSH, Telnet or both?
第19题:
Service Processor
Service Director
Inventory Scout Services
Service Focal Point
第20题:
IBM Techline
IBM Supportline
IBM Software Distribution
IBM Hardware Support
第21题:
Some Express Configurations limit the amount of maximum memory at order time.
The customer must meet minimum system requirements to obtain Express Configuration pricing.
The Express Configurations offer less than the maximum number of processors.
The Express Configurations are only offered through the QuickShip Program.
第22题:
Request that the pSeries technical specialist provide the discount percentage to the customer.
Run both eConfig and PCRS6000 to ensure that both configurators provide the same upgrade quote.
Confirm with the customer that the installed inventory accurately reflects what is actually installed.
Provide options to the customer so they can choose the most appropriate upgrade for their environment.
第23题:
Have the PDU requirements been met?
Are there sufficient KVM connections?
Is there sufficient service clearance?
Is there sufficient space in the existing rack?
第24题:
Recommend the customer call EMC.
Recommend the customer call IBM hardware support.
Recommend the customer contact SupportLine.
Recommend the customer re-creates the volume groups.