第1题:
Which service component within the prepare phase recommends the appropriate technology strategy to address a business requirement of the customer?()
第2题:
A customer has recently purchased some IBM x445 servers running Red Hat Enterprise AS 3 and wants to connect them to their existing EMC Clarion SAN controller. Which of the following steps must be taken in order to validate the solution?()
第3题:
A customer is interested in purchasing a new IBM System Storage DS8000 solution to consolidateolder ESS and F20 storage systems. What should be done first, prior to final proposaldevelopment?()
第4题:
What is the main reason for doing a Solutions Assurance Review with the customer? ()
第5题:
A customer has installed an IBM System Storage DS8700 with 20 TB of storage, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues since they have added new workloads. The customer asks the storage specialist for guidance. Which of the following actions should be recommended as a first step?()
第6题:
A customer plans to deploy a disaster recovery site and requires a complete mirror of their production and test environments. They have an excellent relationship with the business partner who helped them with their initial deployment. Which of the following will help with a successful implementation?()
第7题:
During the Solution Assurance for a p5 590, Companycom states there is a plan to install OEM Emulex cards in the p5 590. The customer assumes there will be no problem with the plan since IBM resells the Emulex cards. What is the correct response for the customer?()
第8题:
identifying what a customer requires from a proposed solution
analyzes the customer s business requirements and recommends the appropriate Cisco technologies to meet business requirements
determining what end-user training a customer requires
addressinga customer s physical requirements
第9题:
Use eConfig to configure and validate each pSeries and p5 system.
Engage Advanced Technical Support to review any outstanding technical issues.
Confirm with the customer that the solution design meets their requirements.
Perform a Pre-Install Solution Assurance Review to validate required power requirements.
第10题:
IBM technical support services
IBM Global Financing
IBM Global Business Services
IBM Solutions Assurance Review
第11题:
The EMC storage specialist has not participated in the TDA meeting
The FC HBAs are 4 Gbps technology
The Technical and Delivery Assessment review actions were not executed
The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix
第12题:
The IBM CE will install the card
The card will not be supported by IBM
The AIX device driver should work fine
The customer is correct, there should be no problem
第13题:
What IBM resource helps to easily identify a business application that has been validated on IBM Systems?() NOTE:// Solutions that are in this resource represent applications that enable IBM Systems and verify, through customer experience, installing and running in a customer location.
第14题:
What are two components of the Discovery Guide in the Cisco sales approach?()
第15题:
A customer has a failing HBA adapter and needs to identify the location of the adapter. Which of the following AIX commands should the specialist recommend the customer review?()
第16题:
Which of the following people does IBM recommend be involved with a Pre-Sales Solutions Assurance Review?()
第17题:
What is the primary purpose of the Technical and Delivery Assessment (TDA)?()
第18题:
The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()
第19题:
To revalidate the total solution
To overcome objections to the solution
To review the pricing with the customer
To ensure the customer has the correct applications
第20题:
Direct the customer to the Installation Guide for each system to identify the power requirements.
Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.
Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.
Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.
第21题:
PowerVM Lx86
PowerVM Express Edition
PowerVM Standard Edition
PowerVM Enterprise Edition
第22题:
The customer executive who is funding the project
IBM Global Financing when they are financing the purchase
Subject matter experts representing each component of the solution
Hardware installation planning representative responsible for the installation
第23题:
rmdev
chdev
drslot
cfgmgr
第24题:
IBM Standalone Solutions Configuration Tool (SSCT)
IBM Server Proven
IBM System x Reference Sheets (xREF)
IBM Sizing Guides