The 1-way p615 cannot be upgraded to a 2-way p615.
The 1-way p615 can be upgraded to a 2-way p615 should additional capacity be required.
The p615 can be upgraded to a POWER5-based processor.
The p615 is not a good solution, as it does not take advantage of the Advanced POWER Virtualization features.
第1题:
A customer wants to upgrade an existing pSeries system. In addition to retrieving the IBM configuration records, what else should be done to ensure an accurate upgrade quote is provided?()
第2题:
A customer has two locations that host their pSeries servers. Traffic is being routed through the public Internet. The customer needs to exchange confidential financial data between the servers. Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()
第3题:
A customer needs three 2-way application servers and is evaluating the purchase of three p5-520s versus one partitioned 6-way p5-570. They like the benefits provided with dynamic processor sparing. What information should the pSeries technical specialist emphasize to the customer?()
第4题:
A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system. How might the pSeries technical specialist aid the customer in addressing their concern?()
第5题:
A customer has a pSeries that needs to be upgraded from AIX Version 5.1 to AIX Version 5.2. The customer wants to retain /etc/passwd. Which of the following installation types should be used?()
第6题:
IBM Techline
IBM Supportline
IBM Software Distribution
IBM Hardware Support
第7题:
The 1-way p615 cannot be upgraded to a 2-way p615.
The 1-way p615 can be upgraded to a 2-way p615 should additional capacity be required.
The p615 can be upgraded to a POWER5-based processor.
The p615 is not a good solution, as it does not take advantage of the Advanced POWER Virtualization features.
第8题:
Purchase a 4-way p630 to compensate for not using SMT.
Purchase the p5-550 server and install AIX 5.2, which can be upgraded to AIX 5.3 later.
Purchase the p5-550 server and install AIX 5.2 and enable SMT.
Suspend the purchase of a new machine at this time and upgrade the current server to a 4-way server.
第9题:
Direct the customer to the Installation Guide for each system to identify the power requirements.
Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.
Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.
Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.
第10题:
Request that the pSeries technical specialist provide the discount percentage to the customer.
Run both eConfig and PCRS6000 to ensure that both configurators provide the same upgrade quote.
Confirm with the customer that the installed inventory accurately reflects what is actually installed.
Provide options to the customer so they can choose the most appropriate upgrade for their environment.
第11题:
Use eConfig to configure and validate each pSeries and p5 system.
Engage Advanced Technical Support to review any outstanding technical issues.
Confirm with the customer that the solution design meets their requirements.
Perform a Pre-Install Solution Assurance Review to validate required power requirements.
第12题:
HMC
DVD-ROM
Tape drive
Network switch
第13题:
A customer is having problems after an AIX version upgrade from 5.2 to 5.3. Which of the following should the pSeries technical specialist recommend that the customer call?()
第14题:
A customer with p615, p630 and p650 pSeries servers installed and running AIX is considering Linux as an additional environment. Which Linux capabilities can the pSeries Sales Specialist present as choices that are available to enhance the existing systems?()
第15题:
A customer is getting ready to install a new pSeries system into their data center. They are concerned about providing the appropriate clearance around their 7014-T42 to allow for maintenance. What reference material should the pSeries technical specialist provide to the customer?()
第16题:
A customer has several small AIX applications that are expected to grow over the next several years. The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth. They are also concerned about the under-utilization of their IT resources. What should the pSeries technical specialist recommend to address this challenge?()
第17题:
The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()
第18题:
Remove the availability options,as requested, and place the systems on order.
Keep the availability options in the configurations and engage the pricer to provide deep discounting on the solution.
Remove the availability options and review the new configurations with the customer,highlighting the potential exposures.
Keep the availability options in the configurations, knowing that these options may prevent a critical situation in the future.
第19题:
Sales Manual
Announcement Letter
Site and Hardware Planning Information
Adapter, Devices, and Cable Information for Multiple Bus Systems
第20题:
The technical specialist has supported multiple Cluster 1350 environments. References will be provided.
The technical specialist is Linux-certified by two industry groups. Certificate copies will be provided.
The technical specialist has worked on multiple UNIX consolidation projects. References will be provided.
The technical specialist has worked on Linux consolidation efforts. References will be provided.
第21题:
Linux will be restricted to the p650 system, as it is not supported on the p630.
The customer can run Linux on all the existing systems with or without the presence of AIX.
Linux can run in LPARs on the existing systems but Linux will require the presence of AIX in at least one LPAR.
Linux can be installed on all existing systems but will require the AIX Linux Affinity libraries to boot the systems and run Linux.
第22题:
Preservation Install
Retention Install
Overwrite Install
Migration Install
第23题:
The p5-570 offers CoD processors.
The p5-570 requires more rack space than the three p5-520s.
Redundant power is standard on the p5-570 and is optional on the p5-520.
Operating system charges will be less expensive with the p5-520 solution.
第24题:
Install a p615 per application.
Install a p650 with AIX 5.2 and dynamic LPAR and CUoD.
Install the appropriate solution once the requirements are understood.
Install a POWER5 system with AIX 5.3, Advanced POWER Virtualization, and CoD.