单选题Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()A Cards can be added and then enabled via Hardware Management Console (HMC) GUI or command line. B The HMC allows access to the Advanced System Manageme

题目
单选题
Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()
A

Cards can be added and then enabled via Hardware Management Console (HMC) GUI or command line. 

B

The HMC allows access to the Advanced System Management Interface (ASMI), where the slots can be managed. 

C

If the empty slot was already allocated to an LPAR, the LPAR can use the card after the cfgmgr script has been run. 

D

The Hardware Management Console (HMC) GUI can guide a customer through the process of adding a card to an empty slot. 


相似考题
更多“单选题Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()A Cards can be added and then enabled via Hardware Management Console (HMC) GUI or command line. B The HMC allows access to the Advanced System Manageme”相关问题
  • 第1题:

    Prior to implementing an LPAR system, which of the following needs to be done?()

    • A、A graphics monitor must be attached to the server
    • B、Cluster System Management (CSM) software must be installed
    • C、The LPAR system must have an Hardware Management Console (HMC) connected
    • D、Each LPAR must be configured with a CDROM for operating system installation

    正确答案:C

  • 第2题:

    After purchasing the Active Memory Expansion (AME) Enablement Feature,what tasks must be completed before AME can be used?()

    • A、Enable using active partition properties with DLPAR
    • B、Enter the activation key via the AIX 6.1 command line and reboot AIX
    • C、Enter the activation key via the HMC,power cycle the managed system and start the LPAR
    • D、Enter the activation key via the HMC,modify the partition profile and restart the LPAR

    正确答案:B

  • 第3题:

    A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()

    • A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or later
    • B、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMC
    • C、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based  systems connected to the existing one
    • D、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM

    正确答案:A

  • 第4题:

    On which HMC GUI panel can the ’Enable Electronic Service Agent’ option be found?() 

    • A、HMC Management
    • B、Systems Management
    • C、Service Management
    • D、Electronic Management

    正确答案:C

  • 第5题:

    A system administrator wants to control the HMC from their workstation. Microsoft Windows 2000 is running and the HMC graphical user interface is being used remotely. Which of the following actions will accomplish this task?()

    • A、Use any Windows 2000 to graphically access the HMC
    • B、Load, install, and configure WebSM on the workstation
    • C、Telnet to the HMC using Exceed or a GUI emulator product from the workstation
    • D、Load, install, and configure OpenSSH or SSH on the workstation and access the HMC through the GUI interface

    正确答案:B

  • 第6题:

    单选题
    Prior to implementing an LPAR system, which of the following needs to be done?()
    A

    A graphics monitor must be attached to the server

    B

    Cluster System Management (CSM) software must be installed

    C

    The LPAR system must have an Hardware Management Console (HMC) connected

    D

    Each LPAR must be configured with a CDROM for operating system installation


    正确答案: C
    解析: 暂无解析

  • 第7题:

    单选题
    Which of the following can deploy system plans generated by the IBM System Planning Tool (SPT)?()
    A

     The Hardware Management Console (HMC) and Integrated Virtualization Manager (IVM).

    B

     The Hardware Management Console (HMC) and Advanced System Manager Interface (ASMI).

    C

     Integrated Virtualization Manager (IVM) and Advanced System Manager Interface (ASMI).

    D

     Integrated Virtualization Manager (IVM) and BladeCenter Advanced Management Module (AMM).


    正确答案: D
    解析: 暂无解析

  • 第8题:

    单选题
    Which of the following statements is true regarding implementing Live Partition Mobility on two existing POWER6 based systems?()
    A

    The systems must use internal storage for boot purposes. 

    B

    All virtualized ethernet adapters must be numbered below 10. 

    C

    The mobile partition's network and disk access must be virtualized. 

    D

    Each system must be controlled by a different Hardware Management Console (HMC). 


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    Which of the following interfaces is required to implement Workload Partition Mobility? ()
    A

     Workload Partitions Manager for AIX

    B

     Hardware Management Console (HMC) GUI

    C

     Integrated Virtualization Manager (IVM)

    D

     Advanced System Management Interface (ASMI)


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    After purchasing the Active Memory Expansion (AME) Enablement Feature,what tasks must be completed before AME can be used?()
    A

    Enable using active partition properties with DLPAR

    B

    Enter the activation key via the AIX 6.1 command line and reboot AIX

    C

    Enter the activation key via the HMC,power cycle the managed system and start the LPAR

    D

    Enter the activation key via the HMC,modify the partition profile and restart the LPAR


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    Which of the following is a feature of Integrated Virtualization Manager (IVM)? ()
    A

     It has a GUI interface for upgrading system firmware. 

    B

     It creates and manages AIX/Linux and VIOS type LPARs. 

    C

     It can be managed by the Hardware Management Console (HMC). 

    D

     It supports Live Partition Mobility on POWER6 systems and above.


    正确答案: A
    解析: 暂无解析

  • 第12题:

    单选题
    A system administrator wants to control the HMC from their workstation. Microsoft Windows 2000 is running and the HMC graphical user interface is being used remotely. Which of the following actions will accomplish this task?()
    A

    Use any Windows 2000 to graphically access the HMC

    B

    Load, install, and configure WebSM on the workstation

    C

    Telnet to the HMC using Exceed or a GUI emulator product from the workstation

    D

    Load, install, and configure OpenSSH or SSH on the workstation and access the HMC through the GUI interface


    正确答案: C
    解析: 暂无解析

  • 第13题:

    Which of the following statements is true regarding implementing Live Partition Mobility on two existing POWER6 based systems?()

    • A、The systems must use internal storage for boot purposes. 
    • B、All virtualized ethernet adapters must be numbered below 10. 
    • C、The mobile partition's network and disk access must be virtualized. 
    • D、Each system must be controlled by a different Hardware Management Console (HMC). 

    正确答案:C

  • 第14题:

    Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()

    • A、Cards can be added and then enabled via Hardware Management Console (HMC) GUI or command line. 
    • B、The HMC allows access to the Advanced System Management Interface (ASMI), where the slots can be managed. 
    • C、If the empty slot was already allocated to an LPAR, the LPAR can use the card after the cfgmgr script has been run. 
    • D、The Hardware Management Console (HMC) GUI can guide a customer through the process of adding a card to an empty slot. 

    正确答案:B

  • 第15题:

    Which of the following interfaces is required to implement Workload Partition Mobility? ()

    • A、 Workload Partitions Manager for AIX
    • B、 Hardware Management Console (HMC) GUI
    • C、 Integrated Virtualization Manager (IVM)
    • D、 Advanced System Management Interface (ASMI)

    正确答案:A

  • 第16题:

    Which of the following is a feature of Integrated Virtualization Manager (IVM)? ()

    • A、 It has a GUI interface for upgrading system firmware. 
    • B、 It creates and manages AIX/Linux and VIOS type LPARs. 
    • C、 It can be managed by the Hardware Management Console (HMC). 
    • D、 It supports Live Partition Mobility on POWER6 systems and above.

    正确答案:D

  • 第17题:

    单选题
    Which of the following should be done FIRST when setting up a new p5-520 to be managed by a new HMC via a private network?()
    A

    Change passwords in ASMI

    B

    Add the managed system to the HMC

    C

    Connect the p5-520 to a power source

    D

    Connect the HMC and the p5-520 server’s HMC1 port to the same network


    正确答案: B
    解析: 暂无解析

  • 第18题:

    单选题
    In order for DLPAR operations to be possible, the RMC daemons on the Hardware Management Console (HMC) must communicate with the RMC daemons on all of the LPARs involved. How can the RMC daemons be restarted on the HMC, causing the least disruption?()
    A

    Run /usr/sbin/rsct/bin/rmcctrl z as hscroot. 

    B

    Reboot the HMC, either through the GUI or via the command line. 

    C

    Disable and re-enable RMC in the Firewall settings in the HMC GUI. 

    D

    Select the Partition Communication checkbox in the LAN Adapter dialogue box.


    正确答案: B
    解析: 暂无解析

  • 第19题:

    单选题
    A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()
    A

    All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or later

    B

    The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMC

    C

    They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based  systems connected to the existing one

    D

    The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM


    正确答案: B
    解析: 暂无解析

  • 第20题:

    单选题
    A customer has 4 POWER6 servers managed by a Hardware Management Console (HMC). They plan to install a second HMC for redundancy.  Which of the following statements correctlydescribes the dual HMC environment? ()
    A

     To provide the Service Agent function, both HMCs must have Service Agent enabled and a dedicated modem and phone line.

    B

     Authorized users must have the same username and password on both HMCs, so that every user of one HMC is automatically authorized on the other.

    C

     Both HMCs are automatically notified of any changes that occur in the managed systems, so results of changes made to the managed system by one HMC are visible on the

    D

     Both HMCs must be running the same software revision. Software maintenance must be performed on both HMCs at the same time, but one HMC should be disconnected from


    正确答案: B
    解析: 暂无解析

  • 第21题:

    单选题
    Which of the following statements is true regarding implementing Live Partition Mobility on two existing POWER6 based systems? ()
    A

     The systems must use internal storage for boot purposes.

    B

     All virtualized Ethernet adapters must be numbered below 10.

    C

     The mobile partition’s network and disk access must be virtualized.

    D

     Each system must be controlled by a different Hardware Management Console (HMC).


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    On which HMC GUI panel can the ’Enable Electronic Service Agent’ option be found?()
    A

    HMC Management

    B

    Systems Management

    C

    Service Management

    D

    Electronic Management


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    An administrator wants to query the CPU resources of the managed system 9117-MMA*6512345 from the Hardware Management Console (HMC) command line.  Which of the following HMC commands could achieve this?()
    A

     lssysres -r cpu -m 9117-MMA*6512345 -r sys

    B

     lssyscfg -r proc -m 9117-MMA*6512345 -r sys

    C

     lshwres -r proc -m 9117-MMA*6512345 --level sys

    D

     lshwcfg -r proc -m 9117-MMA*6512345 --level sys


    正确答案: A
    解析: 暂无解析