单选题A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A Populate the Power 750 fi

题目
单选题
A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()
A

Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.

B

Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.

C

Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.

D

Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer  loops.


相似考题
更多“单选题A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A Populate the Power 750 fi”相关问题
  • 第1题:

    Which of the following statements is true regarding implementing Live Partition Mobility on two existing POWER6 based systems?()

    • A、The systems must use internal storage for boot purposes. 
    • B、All virtualized ethernet adapters must be numbered below 10. 
    • C、The mobile partition's network and disk access must be virtualized. 
    • D、Each system must be controlled by a different Hardware Management Console (HMC). 

    正确答案:C

  • 第2题:

    A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()

    • A、PCIe adapters
    • B、PCI-X adapters
    • C、PCI-X andPCIe adapters
    • D、PCI, PCI-X andPCIe adapters

    正确答案:A

  • 第3题:

    A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancy and hot-swap capability are required. What configuration supports the customer requirements?()

    • A、Configure the PCIe SSD adapter and drive modules as a JBOD
    • B、Configure a pair of mirrored PCIe SSD adapters and drive modules
    • C、Configure the PCIe SSD adapter and drive modules in a RAID-6 array
    • D、Configure the PCIe SSD adapter and drive modules in a RAID-5 array

    正确答案:B

  • 第4题:

    A Power 770 customer needs to add additional I/O adapters.  There is no room for the cards, so an I/O drawer must be added. What resource will help identify supported I/O drawers and the maximum number of drawers permitted per loop?()

    • A、I/O Planning Guide
    • B、Power Systems data sheet
    • C、Power Systems Facts and Features
    • D、Run FLRT to recommend I/O features

    正确答案:C

  • 第5题:

    A customer is upgrading from a 16-core POWER6 570 with two enclosures to a 16-core Power 770 with only one enclosure. There are 22 PCI-X adapters and 19 PCIe adapters spread across the current CECs and I/O drawers. How many and what kind of drawers are needed to connect these adapters?()

    • A、2 PCI-X drawers and 2 PCIe drawers
    • B、3 PCI-X drawers and 4 PCIe drawers
    • C、4 PCI-X drawers and 3 PCIe drawers
    • D、4 PCI-X drawers and 2 PCIe drawers

    正确答案:D

  • 第6题:

    单选题
    An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
    A

    An additional switch for the new HMC

    B

    Asynchronous adapters on the new HMC

    C

    The two 570 servers are directly connected to the new HMC

    D

    One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC


    正确答案: B
    解析: 暂无解析

  • 第7题:

    单选题
    A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()
    A

    Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.

    B

    Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.

    C

    Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.

    D

    Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer  loops.


    正确答案: C
    解析: 暂无解析

  • 第8题:

    单选题
    A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()
    A

    All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or later

    B

    The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMC

    C

    They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based  systems connected to the existing one

    D

    The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    Which of the following statements is true regarding implementing Live Partition Mobility on two existing POWER6 based systems? ()
    A

     The systems must use internal storage for boot purposes.

    B

     All virtualized Ethernet adapters must be numbered below 10.

    C

     The mobile partition’s network and disk access must be virtualized.

    D

     Each system must be controlled by a different Hardware Management Console (HMC).


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancy and hot-swap capability are required. What configuration supports the customer requirements?()
    A

    Configure the PCIe SSD adapter and drive modules as a JBOD

    B

    Configure a pair of mirrored PCIe SSD adapters and drive modules

    C

    Configure the PCIe SSD adapter and drive modules in a RAID-6 array

    D

    Configure the PCIe SSD adapter and drive modules in a RAID-5 array


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()
    A

    Populate the Power 750 first then add a GX+ adapter to support PCI-X and PCIe I/O drawer loops.

    B

    Populate the Power 750 first then add 2 GX+ adapters to support PCI-X and PCIe I/O drawer loops.

    C

    Populate the Power 750 first then add a GX++ adapter to support PCI-X and PCIe I/O drawer loops.

    D

    Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X and PCIe I/O drawer loops.


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()
    A

    PCIe adapters

    B

    PCI-X adapters

    C

    PCI-X and PCIe adapters

    D

    PCI,  PCI-X and PCIe adapters


    正确答案: D
    解析: 暂无解析

  • 第13题:

    A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure. Which solution addresses the customer requirements?()

    • A、Move the storage into a common SAN and virtualize the I/O using a single VIO Server with dual NIC connectors and dual HBAs
    • B、Move the existing physical network and storage adapters to the new system and virtualize the I/O using a  single VIO Server.
    • C、Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, each with dual NIC  connectors and dual HBAs.
    • D、Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, one with dual NIC  connectors and the other with dual HBAs.

    正确答案:C

  • 第14题:

    A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()

    • A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or later
    • B、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMC
    • C、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based  systems connected to the existing one
    • D、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM

    正确答案:A

  • 第15题:

    A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()

    • A、Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.
    • B、Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.
    • C、Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.
    • D、Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer  loops.

    正确答案:D

  • 第16题:

    A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()

    • A、Populate the Power 750 first then add a GX+ adapter to support PCI-X and PCIe I/O drawer loops.
    • B、Populate the Power 750 first then add 2 GX+ adapters to support PCI-X and PCIe I/O drawer loops.
    • C、Populate the Power 750 first then add a GX++ adapter to support PCI-X and PCIe I/O drawer loops.
    • D、Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X and PCIe I/O drawer loops.

    正确答案:D

  • 第17题:

    单选题
    A Power 770 customer needs to add additional I/O adapters.  There is no room for the cards, so an I/O drawer must be added. What resource will help identify supported I/O drawers and the maximum number of drawers permitted per loop?()
    A

    I/O Planning Guide

    B

    Power Systems data sheet

    C

    Power Systems Facts and Features

    D

    Run FLRT to recommend I/O features


    正确答案: C
    解析: 暂无解析

  • 第18题:

    单选题
    A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()
    A

    PCIe adapters

    B

    PCI-X adapters

    C

    PCI-X andPCIe adapters

    D

    PCI, PCI-X andPCIe adapters


    正确答案: A
    解析: 暂无解析

  • 第19题:

    单选题
    When considering migrating a POWER6 server with PCI-X and PCIe adapters to a Power 720, which statement is true?()
    A

    PCIe adapters are supported only in I/O drawers

    B

    PCI-X adapters are supported in both the CEC and in I/O drawers

    C

    PCI-X adapters are supported in the CEC; PCIe adapters are supported in 12X I/O drawers

    D

    PCIe adapters are supported in the CEC; PCI-X adapters are supported in 12X I/O drawers


    正确答案: D
    解析: 暂无解析

  • 第20题:

    单选题
    A customer is upgrading from a 16-core POWER6 570 with two enclosures to a 16-core Power 770 with only one enclosure. There are 22 PCI-X adapters and 19 PCIe adapters spread across the current CECs and I/O drawers. How many and what kind of drawers are needed to connect these adapters?()
    A

    2 PCI-X drawers and 2 PCIe drawers

    B

    3 PCI-X drawers and 4 PCIe drawers

    C

    4 PCI-X drawers and 3 PCIe drawers

    D

    4 PCI-X drawers and 2 PCIe drawers


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()
    A

    Populate the Power 750 first then add a GX+ adapter to support PCI-X and PCIe I/O drawer loops.

    B

    Populate the Power 750 first then add 2 GX+ adapters to support PCI-X and PCIe I/O drawer loops.

    C

    Populate the Power 750 first then add a GX++ adapter to support PCI-X and PCIe I/O drawer loops.

    D

    Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X and PCIe I/O drawer loops.


    正确答案: A
    解析: 暂无解析

  • 第22题:

    单选题
    A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()
    A

    Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.

    B

    Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.

    C

    Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.

    D

    Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer  loops.


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure. Which solution addresses the customer requirements?()
    A

    Move the storage into a common SAN and virtualize the I/O using a single VIO Server with dual NIC connectors and dual HBAs

    B

    Move the existing physical network and storage adapters to the new system and virtualize the I/O using a  single VIO Server.

    C

    Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, each with dual NIC  connectors and dual HBAs.

    D

    Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, one with dual NIC  connectors and the other with dual HBAs.


    正确答案: A
    解析: 暂无解析

  • 第24题:

    单选题
    A small organization is purchasing a POWER5 to consolidate four applications. Currently, each application has two Host Bus Adapters (HBA) connected to an Enterprise Storage Server (ESS). The customer is concerned about the cost of purchasing eight new HBAs. Which feature of virtualization will be most beneficial to this organization?()
    A

    Virtual Ethernet

    B

    Micro-Partitioning

    C

    Virtual I/O Server

    D

    Capped and uncapped partitions


    正确答案: B
    解析: 暂无解析