更多“In anchoring orders, WALK BACK THE CHAIN means ______.A.pay away the chain ”相关问题
  • 第1题:

    In anchor orders, “Up and down” means “()”.

    • A、The chain is not upright
    • B、The chain is upright
    • C、The chain is slack
    • D、The chain is not slack

    正确答案:B

  • 第2题:

    Which of the following must occur when installing SCSI devices into the server?()

    • A、 Terminate the back end of the chain.
    • B、 Set the jumper to device ID 0.
    • C、 Terminate both ends of the chain.
    • D、 Set the jumper to cable select.

    正确答案:C

  • 第3题:

    单选题
    In anchor orders, “Up and down” means “()”.
    A

    The chain is not upright

    B

    The chain is upright

    C

    The chain is slack

    D

    The chain is not slack


    正确答案: A
    解析: 暂无解析

  • 第4题:

    单选题
    When anchoring,it is a common rule of thumb to use a length of chain().
    A

    five to seven times the depth of water

    B

    seven to ten times the depth of water

    C

    twice the depth of water

    D

    twice the depth of water plus the range of tide


    正确答案: C
    解析: 暂无解析

  • 第5题:

    单选题
    When a deck cargo is secured with chain or wire lashings and grab (pear) links,which statement is FALSE?()
    A

    The amount of take-up is limited by the length of the turnbuckle

    B

    At the grab (pear) link,the slack end of chain should be led back and secured to the chain above the link

    C

    The lashings should be inspected each day and any slack taken up

    D

    The turnbuckle should be secured with a stick or lock nuts


    正确答案: C
    解析: 暂无解析

  • 第6题:

    单选题
    A common means of connecting shots of anchor chain in the field is to use a().
    A

    sprocket

    B

    Kenter link

    C

    swivel

    D

    end shackle


    正确答案: A
    解析: 暂无解析

  • 第7题:

    单选题
    ()is used for heaving up and slacking away the anchor and chain.
    A

    A winch

    B

    A windlass

    C

    A deck crane

    D

    A lifeboat engine


    正确答案: C
    解析: 暂无解析

  • 第8题:

    单选题
    After deploying the anchor,a permanent chain chaser is().
    A

    removed from the anchor chain

    B

    connected to a buoy at the anchor

    C

    stripped back to the rig and secured

    D

    connected to a buoy halfway down the chain


    正确答案: D
    解析: 暂无解析

  • 第9题:

    单选题
    When anchoring a small sailing vessel in rough weather,the best anchor line would be composed of().
    A

    chain-wire

    B

    chain-manila

    C

    chain-nylon

    D

    all chain


    正确答案: A
    解析: 暂无解析

  • 第10题:

    多选题
    Which two statements are true about a job chain?()
    A

    A job chain can contain a nested chain of jobs

    B

    The jobs in a job chain cannot have more than one dependency

    C

    A job of the CHAIN type can be run using event-based or time-based schedules

    D

    The jobs in a job chain can be executed only by using the events generated by the Scheduler


    正确答案: A,B
    解析: 暂无解析

  • 第11题:

    单选题
    A sufficient amount of chain must be veered when anchoring a vessel to ensure().
    A

    the vessel has enough room to swing while at anchor

    B

    the anchor flukes bite into the ocean bottom

    C

    there is sufficient weight from the anchor and chain to prevent dragging

    D

    there is more chain out than there is in the chain locker


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    When anchoring a vessel under normal conditions,which scope of chain is recommended? ()
    A

    Four times the depth of water

    B

    Two and one-half times the depth of water

    C

    Five to seven times the depth of water

    D

    Fifteen times the depth of water


    正确答案: A
    解析: 暂无解析

  • 第13题:

    Where is()(制链器螺杆)?

    • A、compressor bar
    • B、chain link
    • C、chain stopper
    • D、chain locker

    正确答案:A

  • 第14题:

    Which two statements are true about a job chain?()

    • A、 A job chain can contain a nested chain of jobs
    • B、 The jobs in a job chain cannot have more than one dependency
    • C、 A job of the CHAIN type can be run using event-based or time-based schedules
    • D、 The jobs in a job chain can be executed only by using the events generated by the Scheduler

    正确答案:A,C

  • 第15题:

    单选题
    In anchoring orders, up and down means().
    A

    the chain is not upright

    B

    the chain is tight

    C

    the chain is upright

    D

    the chain is slack


    正确答案: C
    解析: 暂无解析

  • 第16题:

    单选题
    What are the two main types of stud link chain().
    A

    Oil Rig chain and Oil Field Stud Link chain

    B

    Flash-butt welded chain and Di-Lok chain

    C

    Flash-butt welded chain and Oil Rig chain

    D

    Oil Field Stud Link chain and Flash-butt welded chain


    正确答案: B
    解析: 暂无解析

  • 第17题:

    单选题
    A sufficient amount of chain must be veered when anchoring a vessel to ensure().
    A

    the vessel has enough room to swing while at anchor

    B

    the anchor flukes bite into the ocean bottom

    C

    there is a sufficient scope of chain to keep the anchor on the bottom

    D

    there is more chain out than there is in the chain locker


    正确答案: B
    解析: 暂无解析

  • 第18题:

    单选题
    In anchoring orders, “Weigh anchor” means “()”.
    A

    Pay away the chain

    B

    Take in the chain

    C

    Check up the chain

    D

    Drop the anchor


    正确答案: C
    解析: 暂无解析

  • 第19题:

    单选题
    When anchoring,good practice requires 5 to 7 fathoms of chain for each fathom of depth. In deep water you should use().
    A

    the same ratio

    B

    more chain for each fathom of depth

    C

    less chain for each fathom of depth

    D

    two anchors with the same ratio of chain


    正确答案: D
    解析: 暂无解析

  • 第20题:

    单选题
    Which of the following must occur when installing SCSI devices into the server?()
    A

     Terminate the back end of the chain.

    B

     Set the jumper to device ID 0.

    C

     Terminate both ends of the chain.

    D

     Set the jumper to cable select.


    正确答案: A
    解析: 暂无解析

  • 第21题:

    单选题
    A chain stripper is used to().
    A

    prevent chain from clinging to the wildcat

    B

    clean the marine debris from the chain

    C

    flake chain from a boat's chain locker

    D

    clean chain prior to an x-ray inspection


    正确答案: A
    解析: 暂无解析

  • 第22题:

    单选题
    In anchoring orders, walk back the chain means().
    A

    pay away the chain

    B

    take in the chain

    C

    check up the chain

    D

    take a strain on the chain


    正确答案: B
    解析: 暂无解析

  • 第23题:

    单选题
    What is the best guide for determining the proper scope of anchor chain to use for anchoring in normal conditions?()
    A

    One shot of chain for every ten feet of water

    B

    One shot of chain for every fifteen feet of water

    C

    One shot of chain for every thirty feet of water

    D

    One shot of chain for every ninety feet of water


    正确答案: A
    解析: 暂无解析