A new switch is being installed and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches.Which of the following mus

题目

A new switch is being installed and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches.Which of the following must you do to accomplish this?()

A. You must set each end of the trunk line to IEEE 802.1e encapsulation.

B. You must set the same VTP management domain name on both switches.

C. You must set all ports on the two switches as access ports.

D. You must configure one of the switches as a VTP server.

E. You must use a rollover cable to connect the two switches.


相似考题
更多“A new switch is being installed and you have been assigned the task of connecting it to an ”相关问题
  • 第1题:

    Certkiller .com has a server named Certkiller -SR05 that has numerous processors installed.You have been given the task of developing an application that displays certain clock speed statisticson all processors installed on Certkiller -SR05.You need to ensure that this requirement is fully satisfied.What should you do?()

    A.

    B.

    C.

    D.


    参考答案:B

  • 第2题:

    Have you installed the new software?()

    AInstalled. 

    BUninstalled.

    CNo, not yet. 

    DYes, not yet.


    C

  • 第3题:

    While designing your database, you have created the EMPLOYEES table as an index/x7forganized table (IOT). You want to create a bitmap index on the JOB_ID column to make queries faster. Which task must have been completed so that you are able to create the bitmap index?()

    • A、A primary key must have been created.
    • B、A mapping table must have been created.
    • C、An overflow tablespace must have been specified.
    • D、The PCTTHRESHOLD option must have been specified.

    正确答案:B

  • 第4题:

    In which of the following scenarios would the "show cdp neighbors detail"command be an appropriate troubleshooting tool?()

    • A、Two switches are connected via a trunk. Both switches have been assigned an IP address, subnet mask, and default gateway. A ping is successful between the two switches. However, VLAN information is not passed from one switch to the other switch.
    • B、A router and a switch have been assigned an IP address, a subnet mask, and a default gateway. They are directly connected, but a ping between the two devices fails.
    • C、A router connects to another router through a serial interface. Both routers have been assigned an IP address, subnet mask, and default gateway. The routers are running RIP and the networks directly connected to the first router do not pass to the second router. However, a ping from one router to the serial interface of the directly connected neighboring router is successful.
    • D、A router connects to another router via a switch. Both routers and the switch have been assigned an IP address, subnet mask, and default gateway. Neither the routers nor the switch are able to ping one of the hosts that is directly to the switch.

    正确答案:B

  • 第5题:

    You have a computer that runs Windows XP Professional Service Pack 2 (SP2). You need to configure the computer so that Windows updates are downloaded nightly. You must prevent the updates from being installed automatically. What should you do?() 

    • A、Modify Automatic Updates. 
    • B、Install and configure Windows Defender. 
    • C、Create a scheduled task that runs gpupdate.exe /sync.
    • D、Create a scheduled task that runs winnt32. exe /duprepare.

    正确答案:A

  • 第6题:

    You have just created a new VLAN on your network.  What is one step that you should include in your VLAN-based implementation and verification plan? ()

    • A、Verify that trunked links are configured to allow the VLAN traffic.
    • B、Verify that the switch is configured to allow for trunking on the switch ports.
    • C、Verify that each switch port has the correct IP address space assigned to it for the new VLAN.
    • D、Verify that different native VLANs exist between two switches for security purposes.

    正确答案:A

  • 第7题:

    A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()

    • A、Ensure Director Agent is installed on the new servers.
    • B、Ensure a DHCP Sever is installed and configured in the environment.
    • C、Ensure Server Plus Pack option has been installed and configured.
    • D、Ensure Software Distribution has been installed on the IBM Director Server and an image has been created.
    • E、Ensure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created.

    正确答案:B,E

  • 第8题:

    While designing your database, you have created the EMPLOYEEStable as an index-organized (IOT). You want to create a bitmap index on the JOD_IDcolumn to make queries faster. Which task must have been completed so that you are able to create the bitmap index?()

    • A、 A primary key must have been created.
    • B、 A mapping table must have been created.
    • C、 An overflow tablespace must have been specified.
    • D、 The PCTTHRESHOLD option must have been specified.

    正确答案:B

  • 第9题:

    单选题
    You are planning a new VLAN-based network solution.  What is one item you should consider when creating your implementation plan as it concerns VLANs?()
    A

    generic router and switch configuration parameters

    B

    end-to-end test plan after all components have been installed and  configured

    C

    administrator assignments

    D

    rollback plan


    正确答案: A
    解析: 暂无解析

  • 第10题:

    单选题
    You are designing a group management strategy for users in the finance department. You need to  identify the appropriate changes that need to be made to the current group management strategy. You want to accomplish this goal by using the minimum number of groups.  What should you do?()
    A

     Add the finance users to the financeData group to which the necessary permissions have been assigned.

    B

     Add the finance users to the financeGG group to which the necessary permissions have been assigned.

    C

     Add the finance users to the financeGG group. Then add the financeGG group to the financeData group to which the necessary permissions have been assigned.

    D

     Add the finance users to the financeGG group. Add the financeGG group to the financeUG group to the financeDat group to which the necessary permissions have been assigned.


    正确答案: B
    解析: 暂无解析

  • 第11题:

    单选题
    While designing your database, you have created the EMPLOYEEStable as an index-organized (IOT). You want to create a bitmap index on the JOD_IDcolumn to make queries faster. Which task must have been completed so that you are able to create the bitmap index?()
    A

     A primary key must have been created.

    B

     A mapping table must have been created.

    C

     An overflow tablespace must have been specified.

    D

     The PCTTHRESHOLD option must have been specified.


    正确答案: D
    解析: 暂无解析

  • 第12题:

    多选题
    You have just purchased a new Cisco 3560 switch running the enhanced IOS and need configure  it to be installed in a high availability network. On a 3560 EMI switch,  which three types of  interfaces can be used to configure HSRP?()
    A

    SVI interface

    B

    Access port

    C

    EtherChannel port channel

    D

    Loopback interface

    E

    Routed port

    F

    BVI interface


    正确答案: B,F
    解析: 暂无解析

  • 第13题:

    --Have you moved into the new house?
    --Not yet.The room__.

    A.is being painted
    B.are painting
    C.are painted
    D.are being painted

    答案:A
    解析:
    本句使用被动语态的进行时。

  • 第14题:

    Have you installed the new software?()

    • A、Installed. 
    • B、Uninstalled.
    • C、No, not yet. 
    • D、Yes, not yet.

    正确答案:C

  • 第15题:

    A switch that is to be added to the production network has been preconfigured (trunks, VLANs, VTP, and STP) and was tested in your lab. After installing the switch into the network, the entire network went down.  What might explain what happened? ()

    • A、The new switch happened to be running Cisco Catalyst operating system, while the other network switches were running Cisco IOS Software.
    • B、The configuration revision of the new switch was higher than the configuration revision of the production VTP domain.
    • C、The link costs on the new switch are set to a high value, causing all ports on the new switch to go into a forwarding mode and none into blocking mode, thereby causing a spanning-tree loop.
    • D、The ports connecting to the two switches have been configured incorrectly. One side has the command switchport mode access and the other switchport mode trunk.

    正确答案:B

  • 第16题:

    You have been assigned to manage a set of databases. The previous DBA did not leave you notes regarding the structure of each of the databases. While analyzing an instance, you notice that the system identifier (SID) for the instance is set to ’+ASM’. What is the purpose of this instance?()

    • A、 This instance is being used to manage the operating system files.
    • B、 This instance is being used to manage the files of other databases.
    • C、 This instance is being used to manage the instances of other databases.
    • D、 This instance is being used to manage the background processes of other instances.

    正确答案:B

  • 第17题:

    You have just purchased a new Cisco 3560 switch running the enhanced IOS and need configure  it to be installed in a high availability network. On a 3560 EMI switch,  which three types of  interfaces can be used to configure HSRP?()

    • A、 SVI interface
    • B、 Access port
    • C、 EtherChannel port channel
    • D、 Loopback interface
    • E、 Routed port
    • F、 BVI interface

    正确答案:A,C,E

  • 第18题:

    A new switch is being installed and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches. Which of the following must you do to accomplish this?()

    • A、You must set each end of the trunk line to IEEE 802.1e encapsulation.
    • B、You must set the same VTP management domain name on both switches.
    • C、You must set all ports on the two switches as access ports.
    • D、You must configure one of the switches as a VTP server.
    • E、You must use a rollover cable to connect the two switches.

    正确答案:B,D

  • 第19题:

    You have been tasked with performing an update to the IDP attack database. Which three requirements areincluded as part of this task?()

    • A、The IDP security package must be installed after it is downloaded.
    • B、The device must be rebooted to complete the update.
    • C、The device must be connected to a network.
    • D、An IDP license must be installed on your device.
    • E、You must be logged in as the root user

    正确答案:A,C,D

  • 第20题:

    单选题
    A switch that is to be added to the production network has been preconfigured (trunks, VLANs, VTP, and STP) and was tested in your lab. After installing the switch into the network, the entire network went down.  What might explain what happened? ()
    A

    The new switch happened to be running Cisco Catalyst operating system, while the other network switches were running Cisco IOS Software.

    B

    The configuration revision of the new switch was higher than the configuration revision of the production VTP domain.

    C

    The link costs on the new switch are set to a high value, causing all ports on the new switch to go into a forwarding mode and none into blocking mode, thereby causing a spanning-tree loop.

    D

    The ports connecting to the two switches have been configured incorrectly. One side has the command switchport mode access and the other switchport mode trunk.


    正确答案: A
    解析: 暂无解析

  • 第21题:

    多选题
    A new switch is being installed and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches. Which of the following must you do to accomplish this?()
    A

    You must set each end of the trunk line to IEEE 802.1e encapsulation.

    B

    You must set the same VTP management domain name on both switches.

    C

    You must set all ports on the two switches as access ports.

    D

    You must configure one of the switches as a VTP server.

    E

    You must use a rollover cable to connect the two switches.


    正确答案: E,D
    解析: 暂无解析

  • 第22题:

    单选题
    You have been assigned to manage a set of databases. The previous DBA did not leave you notes regarding the structure of each of the databases. While analyzing an instance, you notice that the system identifier (SID) for the instance is set to ’+ASM’. What is the purpose of this instance?()
    A

     This instance is being used to manage the operating system files.

    B

     This instance is being used to manage the files of other databases.

    C

     This instance is being used to manage the instances of other databases.

    D

     This instance is being used to manage the background processes of other instances.


    正确答案: C
    解析: 暂无解析

  • 第23题:

    单选题
    You have just created a new VLAN on your network for inter-VLAN routing.  What is one step that you should include in your VLAN-based implementation and verification plan?()
    A

    Verify that different native VLANs exist between two switches for security purposes.

    B

    Verify that the switch is configured to allow for trunking on the switch ports.

    C

    Verify that each switch port has the proper IP address space assigned to it for the new VLAN. 

    D

    Verify that the VLAN virtual interface has been correctly created and enabled.


    正确答案: B
    解析: 暂无解析

  • 第24题:

    单选题
    You are the network administrator for Company. You have been assigned the task to create and deploy a standard Windows 2000 Professional image to all 2,500 client computers that today are installed with Windows 98. You log on to a client computer called Company by using a local administrative account called SetupUser and install three Windows 2000 professional compatible software packages on Company. You create an image using third party software. You deploy the image to a test client computer and join the client computer to a domain. You want to create shortcuts on all users' desktops for the software packages you installed. You also want users to have the option to delete the icons.  Which profile must you edit?()
    A

    The SetupUser profile

    B

    The Default User profile

    C

    The Administrator profile

    D

    The System profile

    E

    The All Users profile


    正确答案: C
    解析: 暂无解析