● The critical path in a schedule network is the path that:A Takes the longest time to completeB Must be done before any other tasksC Allows some flexibility in scheduling a start time.D Is not affected by schedule slippageE All of the above.

题目

● The critical path in a schedule network is the path that:

A Takes the longest time to complete

B Must be done before any other tasks

C Allows some flexibility in scheduling a start time.

D Is not affected by schedule slippage

E All of the above.


相似考题
更多“● The critical path in a schedule network is the path that:A Takes the longest time to completeB Must be done before any other tasksC Allows some flexibility in scheduling a start time.D Is not affected by schedule slippageE All of the above.”相关问题
  • 第1题:

    Management has decided to "crash" a project in order to avoid penalty payments for late deliveries. To crash the project, either overtime or additional resources should be assigned to:

    A.All activities.

    B.Only those activities with the longest time durations.

    C.Those activities on the critical path begining with the longest time duration activities.

    D.Those activities with the greatest degree of risk.

    E.None of the above.


    正确答案:C
    C

  • 第2题:

    The critical path in a network is the path that:

    A.Has the greatest degree of risk.

    B.Will elongate the project if the activities on this path take longer than anticipated.

    C.Must be completed before all other paths.

    D.All of the above.

    E.A and B only.


    正确答案:B
    B

  • 第3题:

    During a project review meeting, you discover that your $250,000 project has a negative schedule variance of $20,000 which equates to 12% of the work scheduled to this point of time. You can therefore conclude that:

    A . The project will be completed late.

    B . The critical path has been lengthened.

    C . the costs are being overrun.

    D . Overtime will be required to maintain the original critical path.

    E . None of the above.


    正确答案:E

  • 第4题:

    The schedule risk is the _____ .

    A the accumulated "expected' durations which maintain project completion.

    B Critical Path adjusted by "high-risk" activity float.

    C highest risk path that maintains quality.

    D Critical Path when calculated with "most likely" duration.

    E highest risk path that contributes the most risk toward the project completion.


    正确答案:B

  • 第5题:

    88 A non-critical path activity is completed in half the time. Then,

    A. The critical path is also reduced.

    B. The slack in the path containing this activity will increase.

    C. The total cost for this activity has decreased.

    D. Manpower from this activity can be assigned to other activities.

    E. All of the above


    正确答案:B

  • 第6题:

    181 The critical path in a schedule network is the path that:

    A. Takes the longest time to complete

    B. Must be done before any other tasks

    C. Allows some flexibility in scheduling a start time.

    D. Is not affected by schedule slippage

    E. All of the above


    正确答案:A

  • 第7题:

    163 During a project review meeting, you discover that your $250,000 project has a negative schedule variance of $20,000 which equates to 12% of the work scheduled to this point of time. You can therefore conclude that:

    A. The project will be completed late.

    B. The critical path has been lengthened.

    C. the costs are being overrun.

    D. Overtime will be required to maintain the original critical path.

    E. None of the above.


    正确答案:E

  • 第8题:

    ● The critical path is calculated by

    A subtracting the end date of task one from the start date of task two.

    B determining which tasks have the least amount of total slack.

    C totaling the time for all activities.

    D determining the shortest path through the network.

    E Determining which tasks have the most slack


    正确答案:B

  • 第9题:

    ● A non-critical path activity is completed in half the time. Then,

    A The critical path is also reduced.

    B The slack in the path containing this activity will increase.

    C The total cost for this activity has decreased.

    D Manpower from this activity can be assigned to other activities.

    E All of the above.


    正确答案:B

  • 第10题:

    ● (73) is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the logical relationships that exist between

    them.

    (73)

    A.PERT

    B.AOA

    C.WBS

    D.PDM


    正确答案:D

    试题(73)分析
        (73)  用于关键路径法,是用于编制项目进度网络图的一种方法,它使用方框或者长方形(被称作节点)代表活动,它们之间用箭头连接,显示彼此之间存在的逻辑关系。
      A.PERT            B.AOA             C.WBS             D.PDM
    参考答案
      (73)D

  • 第11题:

    ()is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the logical relationships that exist between them.

    A.PERT
    B.AOA
    C.WBS
    D.PDM

    答案:D
    解析:
    (73)用于关键路径法,是用于编制项目进度网络图的一种方法,它使用方框或者长方形(被称作节点)代表活动,它们之间用箭头连接,显示彼此之间存在的逻辑关系。A.PERT B. AOAC. WBS D. PDM

  • 第12题:

    单选题
    A system must be upgraded from AIX 5.1 to 5.2.  Which of the following scheduling processes should be performed? ()
    A

     Schedule enough down time to backup, upgrade and reboot. 

    B

     Backup, upgrade, then schedule enough down time to reboot the system. 

    C

     Backup, then schedule enough down time to upgrade and reboot the system. 

    D

     No scheduling processes are necessary because no down time is required.


    正确答案: A
    解析: 暂无解析

  • 第13题:

    A non-critical path activity is completed in half the time. Then,

    A.The critical path is also reduced.

    B.The slack in the path containing this activity will increase.

    C.The total cost for this activity has decreased.

    D.Manpower from this activity can be assigned to other activities.

    E.All of the above.


    正确答案:B

  • 第14题:

    Activities with zero time duration are referred to as:

    A.Critical path activites.

    B.Noncritical path activities.

    C.Slack time activities.

    D.Dummies

    E.None of above.


    正确答案:D
    D

  • 第15题:

    Standard deviation of project completion is _____ .

    A a relationship of the uncertainty of critical path activities.

    B an indicator of project end date target confidence

    C a function of critical path, leveling and project costs.

    D A and B

    E All of the above.


    正确答案:D

  • 第16题:

    81 During a project review meeting, you discover that your $250,000 project has a negative schedule variance of $20,000 which equates to 12% of the work scheduled to this point of time. You can therefore conclude that:

    A. The project will be completed late.

    B. The critical path has been lengthened.

    C. the costs are being overrun.

    D. Overtime will be required to maintain the original critical path.

    E. None of the above


    正确答案:E

  • 第17题:

    170 Assume that you have a network where an activity on the critical path can be crashed by two weeks. If the activity is actually crashed by two weeks, then:

    A. The project's schedule will be reduced by 2 weeks.

    B. The available slack on the noncritical paths will increase.

    C. A new critical path may appear after the crash.

    D. All of the above.

    E. A and B only


    正确答案:C

  • 第18题:

    112 The schedule risk is the _____ .

    A. the accumulated "expected' durations which maintain project completion.

    B. Critical Path adjusted by "high-risk" activity float.

    C. highest risk path that maintains quality.

    D. Critical Path when calculated with "most likely" duration.

    E. highest risk path that contributes the most risk toward the project completion


    正确答案:B

  • 第19题:

    ● Which of the following is indicative of negative float?

    A The late start date is earlier than the early start date.

    B The critical path supports the imposed end date.

    C The early finish date is equal to the late finish date.

    D When leads are employed in the schedule.

    E The project is sinking.


    正确答案:A

  • 第20题:

    ● Management has decided to "crash" a project in order to avoid penalty payments for late deliveries. To crash the project, either overtime or additional resources should be assigned to:

    A All activities.

    B Only those activities with the longest time durations.

    C Those activities on the critical path begining with the longest time duration activities.

    D Those activities with the greatest degree of risk.

    E None of the above.


    正确答案:C

  • 第21题:

    ● The critical path in a network is the path that:

    A Has the greatest degree of risk.

    B Will elongate the project if the activities on this path take longer than anticipated.

    C Must be completed before all other paths.

    D All of the above.

    E A and B only.


    正确答案:B

  • 第22题:

    is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles,referred to as nodes,to represent activities and connects them with arrows that show the logical relationships that exist between them. A.PERT B.AOA C.WBS D.PDM


    正确答案:D
    前导图法(PDM)用于关键路径法,是用于编制项目进度网络图的一种方法,它使用方框或者长方形(被称做节点)代表活动,它们之间用箭头连接,显示它们彼此之间存在的逻辑关系。

  • 第23题:

    A system must be upgraded from AIX 5.1 to 5.2.  Which of the following scheduling processes should be performed? ()

    • A、 Schedule enough down time to backup, upgrade and reboot. 
    • B、 Backup, upgrade, then schedule enough down time to reboot the system. 
    • C、 Backup, then schedule enough down time to upgrade and reboot the system. 
    • D、 No scheduling processes are necessary because no down time is required.

    正确答案:A