Ensuring that all work is both authorized and funded by contractual documentation is the responsibility of:
AThe project manager
BThe functional manager
CThe project sponsor
DThe client
EAll of the above
第1题:
Routers R1, R2, R3, and R4 connect to the same 10.10.10.0/24 LAN- based subnet. OSPF is fully working in the subnet. Later, R5, whose OSPF priority is higher than the other four routers, joins the subnet.Which of the following are true about the OSPF database exchange process over this subnet at this point?()
A. R5 will send its DD, LSR, and LSU packets to the 224.0.0.5 all - DR - routers multicast address.
B. R5 will send its DD, LSR, and LSU pack ets to the 224.0.0.6 all - DR - routers multicast address.
C. The DR will inform R5 about LSAs by sending its DD, LSR, and LSU packets to the 224.0.0.6 all- SPF - routers multicast address.
D. The DR will inform R5 about LSAs by sending its DD, LSR, and LSU pa ckets to the 224.0.0.5 all- SPF - routers multicast address.
第2题:
第3题:
1、clear属性取值说法正确的是()。
A.取值为all表示四周浮动元素被删除
B.取值为left表示左侧浮动元素被删除
C.取值为right表示右侧浮动元素被删除
D.取值为both表示清除两侧浮动
第4题:
[A] pledging [B] assuring [C] confirming [D] ensuring
第5题:
9、clear属性取值说法正确的是()。
A.取值为all表示四周浮动元素被删除
B.取值为left表示左侧浮动元素被删除
C.取值为right表示右侧浮动元素被删除
D.取值为both表示清除两侧浮动
第6题:
【判断题】英音里字母r在元音后时念为卷舌音, 如shared, hard, work。
A.Y.是
B.N.否