The project life-cycle can be described as:A.project concept, project planning, project execution, and project close-out.B.project planning, work authorization, and project reporting.C.project planning, project control, project definition, WBS development

题目

The project life-cycle can be described as:

A.project concept, project planning, project execution, and project close-out.

B.project planning, work authorization, and project reporting.

C.project planning, project control, project definition, WBS development, and project termination.

D.project concept, project execution, and project reporting.

E.All of the above.


相似考题
更多“The project life-cycle can be described as:A.project concept, project planning, project ex ”相关问题
  • 第1题:

    Validate Scope is the process?of?formalizing?acceptance?of the?Complete()。

    A.project?deliverables
    B.WBS
    C.activities
    D.milestones

    答案:A
    解析:
    本题翻译:确认范围是正式验收项目已完成的(73)的过程。
    A.项目可交付成果B.WBS C.活动D.里程碑
    本题考查的是范围管理中的确认范围,正确选项为A项目可交付成果。
    确认范围是正式验收项目已完成的可交付成果的过程,其主要作用是使验收过程具有客观性,同时,通过验收每个可交付成果,提高最终产品、服务或成果获得验收的可能性。

  • 第2题:

    Pr中存放素材的窗口是哪个?

    A.Project窗口

    B.Moitor窗口

    C.Timeline窗口

    D.AudioMixer窗口


    Project窗口

  • 第3题:

    以下选项中哪个选项是根路径的表达方法?

    A.D:/Program Files/.Net/Project1

    B./root/.Net/Project1

    C../home/.Net/Project1

    D.file://D:/Program Files/.Net/Project1


    root/.Net/Project1

  • 第4题:

    执行菜单命令(),系统开始对项目进行编译,并生成信息报告

    A.project/compile PCB project

    B.project/project option

    C.Design/netlist/protel

    D.design/make project library


    D

  • 第5题:

    在对原理图进行电气规则检查前,可以()打开规则设置界面。

    A.design-Document Options

    B.Project-Project Options

    C.Tools-Schematic Preferences

    D.Project-Configuration Manager


    Project-Project Options

  • 第6题:

    IAR 430中选择调试器的方式是()

    A.Project选项框中选择Rebuild All

    B.Project选项框中选择Compile

    C.Driver选择框中选项FET Debugger

    D.Driver选择框中选项Run


    A