参考答案和解析
正确答案:D

 

更多“Which of the following are included as part of a scope statement?A.Project justificationB.Project deliverablesC.Project objectivesD.All of the aboveE.B and C”相关问题
  • 第1题:

    Formal written communication is mandated for which of the following?

    A scope changes not part of the original project

    B taking exception to a specification

    C procurement of raw materials

    D All of the above.

    E A and B only


    正确答案:D

  • 第2题:

    177 Formal written communication is mandated for which of the following?

    A. scope changes not part of the original project

    B. taking exception to a specification

    C. procurement of raw materials

    D. All of the above.

    E. A and B only


    正确答案:D

  • 第3题:

    140 In which of the following scope management processes are subject matter experts used? A. Initiation

    B. Scope planning

    C. Scope Definition

    D. Scope change control

    E. Scope verification


    正确答案:A

  • 第4题:

    144 Which of the following is not a scope management process?

    A. Initiation

    B. Scope planning

    C. Scope Definition

    D. Scope change control

    E. Scope verification


    正确答案:D

  • 第5题:

    ● Which of the following are included as part of a scope statement?

    A Project justification

    B Project deliverables

    C Project objectives

    D All of the above

    E B and C


    正确答案:D

  • 第6题:

    White box testing of software testing is a test for software structurE.Which of the following item should not be included in the content of white box?

    A.boundary value analysis

    B.statement testing

    C.branch testing

    D.path testing


    正确答案:A

  • 第7题:

    The inputs of developing project management plan do not include(72). A.project charter B.stakeholder management strategy C.project scope statement D.outputs from planning processes


    正确答案:B
    制定项目管理计划的输入不包括干系人管理策略(stakeholder management strategy)。

  • 第8题:

    White box testing of software testing is a test for software structure. Which of the following item should not be included in the content of white box?(75).

    A.boundary value analysis

    B.statement testing

    C.branch testing

    D.path testing


    正确答案:A
    解析:译文:白盒测试是对软件结构的测试。下列哪一项不是白盒测试的内容?

  • 第9题:

    Which branch of study can NOT be included in the scope of Linguistics?

    A.Syntax
    B.Pragmatics
    C.Phonetics
    D.Anthropology

    答案:D
    解析:
    D选项, 人类语言学,属于宏观语言学,不包括在内。语言学的范畴包括语音学,音系学,形态学,句法学,语义学,语用学,社会语言学,文体学和认知语言学。
    A选项, 句法学,故排除。
    B选项, 语用学,故排除。
    C选项, 语音学,故排除。
    故正确答案为D项。

  • 第10题:

    The inputs of developing project management plan do not include ().

    A.project charter
    B.stakeholder management strategy
    C.project scope statement
    D.outputs from planning processes

    答案:B
    解析:
    制定项目管理计划的输入不包括 () 。
    A.项目章程 B.干系人管理策略
    C.项目范围说明书 D.计划过程输出

  • 第11题:

    Validate Scope is the process?of?formalizing?acceptance?of the?Complete()。

    A.project?deliverables
    B.WBS
    C.activities
    D.milestones

    答案:A
    解析:
    本题翻译:确认范围是正式验收项目已完成的(73)的过程。
    A.项目可交付成果B.WBS C.活动D.里程碑
    本题考查的是范围管理中的确认范围,正确选项为A项目可交付成果。
    确认范围是正式验收项目已完成的可交付成果的过程,其主要作用是使验收过程具有客观性,同时,通过验收每个可交付成果,提高最终产品、服务或成果获得验收的可能性。

  • 第12题:

    ( ) is primarily concerned with defining and controlling what is and is not included in the project.

    A.Project Time Management
    B.Project Cost Management
    C.Project Scope Management
    D.Project Communications Management

    答案:C
    解析:
    项目范围管理是项目管理(包括时间、成本、沟通)的基础。

    项目范围管理是最先定义和决定项目中包含哪些内容和确定边界的。

    选项A是项目时间管理,选项B是项目成本管理,选项C是项目范围管理,选项D是项目沟通管理。因此应选择C。

  • 第13题:

    160 Which of the following is not an input to quality planning?

    A. scope statement.

    B. regulations.

    C. work results.

    D. standards.

    E. quality policy


    正确答案:C

  • 第14题:

    42 Which of the following is not an input to quality planning?

    A. scope statement.

    B. regulations.

    C. work results.

    D. standards.

    E. quality policy.


    正确答案:C

  • 第15题:

    143 In which of the following scope management processes is the scope management plan prepared?

    A. Initiation

    B. Scope planning

    C. Scope Definition

    D. Scope change control

    E. Scope verification


    正确答案:B

  • 第16题:

    146 Which of the following are included as part of a scope statement?

    A. Project justification

    B. Project deliverables

    C. Project objectives

    D. All of the above

    E. B and C


    正确答案:D

  • 第17题:

    ●Where box testing of software testing is a test for software structure.Which of the following item should noe be included ing the content of white box? (75) .

    (75) A.boundary value analysis

    B.statement testing

    C.branch testing

    D.path testing


    正确答案:A
    【解析】译文:白盒测试是对软件结构的测试。下列哪一项不是白盒测试的内容?

  • 第18题:

    The Develop Project Management Plan Process includes the actions necessary to define,prepare,integrate,and coordinate all constituent plans into a(75). A.Project Scope Statement B.Project Management Plan C.Forecasts D.Project Charter


    正确答案:B
    制定项目管理计划过程定义、准备、集成和协调所有的分计划,以形成项目管理计划 。

  • 第19题:

    Which of the following is not a part of reports?

    A: catalogue

    B: title

    C: conclusion

    D: methodology


    正确答案: A

  • 第20题:

    ● Which of the following Project Scope Management processes involves subdividing the major project deliverables into smaller, more manageable components? (74)

    (74)

    A. Scope Planning

    B. Scope Verification

    C. Scope Change Control

    D. Scope Definition


    正确答案:D

  • 第21题:

    Which of the following Project Scope Management processes involves subdividing the major projectdeliverablesinto smaller, more manageable components)()

    A.Scope Planning
    B.Scope Verification
    C.Scope Change Control
    D.Scope Definition

    答案:D
    解析:
    在以下项目范围管理几个过程中,(74)涉及将主要项目可交付成果细分成更小、更容易管理的组件单元。A.范围规划B.范围确认C.范围变更控制D.范围定义

  • 第22题:

    () is the process of obtaining the stakeholders\' formal acceptance of thecompleted project scope. Verifying the scope includes reviewing deliverables and work results toensure that all were completed satisfactorily.

    A.Project acceptance
    B.Scope verification
    C.Scope definition
    D.WBS Creation

    答案:B
    解析:
    范围验证是指获得项目干系人对已完成的项目范围的正式认可的过程。验证范围包括了评审可交付物和工作成果,以确定它们均已令人满意地完成。

  • 第23题:

    The scope management plan is how the team will prepare the( )a document that includes descriptions of create the WBS,verify completion of the project deliverables,and control requests for changes to the project scope.

    A.project charter
    B.project scope goal
    C.project budget
    D.project scope statement

    答案:D
    解析:
    翻译:范围管理计划是团队如何准备项目范围说明文件,包括描述创建WBS,核实项目的可交付成果的完成,并为项目范围变更控制的要求。A.项目章程 B.项目范围目标C.项目预算 D.范围说明书