Before installing a new, upgraded version of the IOS, what should be checked on the router, and which command should be used to gather this information?()A、the amount of available ROMB、the amount of available flash and RAM memoryC、the version of the boots

题目

Before installing a new, upgraded version of the IOS, what should be checked on the router, and which command should be used to gather this information?()

  • A、the amount of available ROM
  • B、the amount of available flash and RAM memory
  • C、the version of the bootstrap software present on the router
  • D、show version
  • E、show processes
  • F、show running-config

相似考题
更多“Before installing a new, upgrade”相关问题
  • 第1题:

    Before installing a new, upgraded version of the IOS, what should be checked on the router, and which command should be used to gather this information?()

    A. the amount of available ROM

    B. the amount of available flash and RAM memory

    C. the version of the bootstrap software present on the router

    D. show version

    E. show processes

    F. show running-config


    参考答案:B, D

  • 第2题:

    A technician is performing a memory upgrade by installing an additional 1GB stick of DDR RAM into a system. When the installation is complete, the computer shows 2GB of RAM at POST; however, it now indicates a lower speed setting for the memory. Which of the following is the MOST likely cause?()

    • A、The newly installed RAM has a lower clock speed than the existing RAM.
    • B、The CPU is not configured to work with the additional RAM.
    • C、The system is incompatible with the new RAM.
    • D、The new RAM is of lower quality, and not dependable at higher speeds.

    正确答案:A

  • 第3题:

    Which of the following tools can be used prior to installing Windows Vista to find hardware compatibility issues?()

    • A、Upgrade Advisor
    • B、Window Aero
    • C、Task Manager
    • D、Device Manager

    正确答案:A

  • 第4题:

    A technician installed a new video card on a motherboard which has onboard video. When the monitor was plugged into the new card and the power was turned on, a no signal message appeared on the monitor. Which of the following is MOST likely the issue?()

    • A、In the BIOS, the onboard video adapter must be disabled.
    • B、The video resolution is set too high.
    • C、The LCD panel is defective.
    • D、The drivers for the new video card must be installed before installing the card.

    正确答案:A

  • 第5题:

    A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()

    • A、e-Config
    • B、System Planning Tool (SPT)
    • C、IBM Workload Estimator (WLE)
    • D、IBM Performance Monitor (PM)

    正确答案:B

  • 第6题:

    You are designing an Active Directory implementation strategy to present to executives from your company and from Contoso, Ltd.  Which implementation strategy should you use?()

    • A、 Upgrade the New York domain. Upgrade the Chicago domain. Create a pristine forest for Contoso, Ltd.
    • B、 Create a pristine forest. Upgrade the New York domain. Upgrade the Chicago domain. Do nothing further.
    • C、 Create pristine forest. Upgrade the New York domain.Upgrade the Chicago domain.Create a pristine forest for Contoso, Ltd.
    • D、 Create a pristine forest.Upgrade the New York domain. Upgrade the Chicago domain.Create a new child domain for Contoso, Ltd.

    正确答案:C

  • 第7题:

    多选题
    Before installing a new, upgraded version of the IOS, what should be checked on the router, and which command should be used to gather this information?()
    A

    the amount of available ROM

    B

    the amount of available flash and RAM memory

    C

    the version of the bootstrap software present on the router

    D

    show version

    E

    show processes

    F

    show running-config


    正确答案: D,B
    解析: 暂无解析

  • 第8题:

    单选题
    Which of the following will corrupt the BIOS?()
    A

     Applying the BIOS settings in the incorrect order

    B

     Power being lost during the upgrade process

    C

     Installing the OS before applying the BIOS upgrade

    D

     Imaging the system after performing a BIOS upgrade


    正确答案: D
    解析: 暂无解析

  • 第9题:

    单选题
    Which of the following will corrupt the BIOS?()
    A

    Applying the BIOS settings in the incorrect order

    B

    Power being lost during the upgrade process

    C

    Installing the OS before applying the BIOS upgrade

    D

    Imaging the system after performing a BIOS upgrade


    正确答案: A
    解析: 暂无解析

  • 第10题:

    单选题
    You perform the following activities during the database upgrade from Oracle Database 10g to Oracle Database 11g: 1. Capture plans for a SQL workload into a SQL Tuning Set (STS) before upgrade. 2. Load these plans from the STS into the SQL plan baseline immediately after the upgrade. What is the reason for performing these activities? ()
    A

    to minimize plan regression due to the use of a new optimizer version

    B

    to completely avoid the use of new plans generated by a new optimizer version

    C

    to prevent plan capturing when the SQL statement is executed after the database upgrade

    D

    to keep the plan in the plan history so that it can be used when the older version of the optimizer is used


    正确答案: B
    解析: 暂无解析

  • 第11题:

    单选题
    An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?()
    A

     Verify uninterruptible power supply (UPS) load

    B

     Verify if server consumes 220V

    C

     Verify CPU load

    D

     Verify if server consumes 110V


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    You are designing an Active Directory implementation strategy to present to executives from your  company and from Contoso, Ltd. Which implementation strategy should you use?()
    A

    Upgrade the New York domain. Upgrade the Chicago domain. Create a pristine forest for Contoso, Ltd.

    B

    Create a pristine forest. Upgrade the New York domain. Upgrade the Chicago domain. Do nothing further.

    C

    Create pristine forest. Upgrade the New York domain. Upgrade the Chicago domain. Create a pristine forest for Contoso, Ltd.  

    D

    Create a pristine forest. Upgrade the New York domain. Upgrade the Chicago domain. Create a new child domain for Contoso, Ltd.  


    正确答案: B
    解析: 暂无解析

  • 第13题:

    Before installing a new device, a technician checks to make sure the device is on the HCL. Which of the following is the advantage of having an HCL device?()

    • A、It is supported by other vendors
    • B、Increases performance
    • C、Decreases cost
    • D、Meets vendor standards

    正确答案:D

  • 第14题:

    Which of the following will corrupt the BIOS?()

    • A、Applying the BIOS settings in the incorrect order
    • B、Power being lost during the upgrade process
    • C、Installing the OS before applying the BIOS upgrade
    • D、Imaging the system after performing a BIOS upgrade

    正确答案:B

  • 第15题:

    An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?()

    • A、Verify uninterruptible power supply (UPS) load
    • B、Verify if server consumes 220V
    • C、Verify CPU load
    • D、Verify if server consumes 110V

    正确答案:C

  • 第16题:

    When installing a new PCIe network card, when should manufacturer software and drivers beinstalled?()

    • A、Before inserting the PCIe network card in the case
    • B、After inserting the new PCIe network card in the case
    • C、They will be automatically loaded after installation
    • D、Load them concurrently with the PCIe network card

    正确答案:A

  • 第17题:

    You perform the following activities during the database upgrade from Oracle Database 10g to Oracle Database 11g: 1. Capture plans for a SQL workload into a SQL Tuning Set (STS) before upgrade. 2. Load these plans from the STS into the SQL plan baseline immediately after the upgrade. What is the reason for performing these activities? ()

    • A、to minimize plan regression due to the use of a new optimizer version
    • B、to completely avoid the use of new plans generated by a new optimizer version
    • C、to prevent plan capturing when the SQL statement is executed after the database upgrade
    • D、to keep the plan in the plan history so that it can be used when the older version of the optimizer is used

    正确答案:A

  • 第18题:

    单选题
    A technician installed a new video card on a motherboard which has onboard video. When the monitor was plugged into the new card and the power was turned on, a no signal message appeared on the monitor. Which of the following is MOST likely the issue?()
    A

    In the BIOS, the onboard video adapter must be disabled.

    B

    The video resolution is set too high.

    C

    The LCD panel is defective.

    D

    The drivers for the new video card must be installed before installing the card.


    正确答案: A
    解析: 暂无解析

  • 第19题:

    多选题
    What are two benefits of installing Grid Infrastructure software for a stand-alone server before installing and creating an Oracle database?()
    A

    Effectively implements role separation

    B

    Enables you to take advantage of Oracle Managed Files.

    C

    Automatically registers the database with Oracle Restart.

    D

    Helps you to easily upgrade the database from a prior release.

    E

    Enables the Installation of Grid Infrastructure files on block or raw devices.


    正确答案: C,D
    解析: 暂无解析

  • 第20题:

    单选题
    You are helping the customer customer configure anthentication,a new asyncOS upgradebecomes available,what should you do?()
    A

    avoid mentioning the upgrade to the customer

    B

    schedule a convenient time to upgrade again, backing up the configuration before and after theupgrade

    C

    contact customer support and ask them to run the upgrade for you

    D

    immediately show the customer how to run the CLI command upgrade


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    Before installing a new device, a technician checks to make sure the device is on the HCL. Which of the following is the advantage of having an HCL device?()
    A

    It is supported by other vendors

    B

    Increases performance

    C

    Decreases cost

    D

    Meets vendor standards


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    You want to install Windows 2000 Professional on 45 new computers on your company’s network. You first install Windows 2000 Professional on one of the new computers. You log on to the computer by using the local administrator account.  You install Microsoft Office 97, a virus scanner, and other company-standard applications. You then create a RIS image of the computer you configured. You want to configure the RIS image so that the standard applications will be accessible to the user when the user first logs on to the network.  What should you do?()
    A

    Run Rbfg.exe before installing the standard applications. 

    B

    Run RIPrep.exe before installing the standard applications. 

    C

    Copy the all users profile to the default users profile.

    D

    Copy the local administrator account profile to the default users profile


    正确答案: A
    解析: By copying the local administrator account profile to the default users profile, all users will get access to the shortcuts which were made when the local administrator installed the applications.

  • 第23题:

    单选题
    You are designing an Active Directory implementation strategy to present to executives from your company and from Contoso, Ltd.  Which implementation strategy should you use?()
    A

     Upgrade the New York domain. Upgrade the Chicago domain. Create a pristine forest for Contoso, Ltd.

    B

     Create a pristine forest. Upgrade the New York domain. Upgrade the Chicago domain. Do nothing further.

    C

     Create pristine forest. Upgrade the New York domain.Upgrade the Chicago domain.Create a pristine forest for Contoso, Ltd.

    D

     Create a pristine forest.Upgrade the New York domain. Upgrade the Chicago domain.Create a new child domain for Contoso, Ltd.


    正确答案: C
    解析: 暂无解析