A client is having problems connecting remotely after replacing a router. An administrator has just created an action plan. Which of the following is the NEXT step the administrator should perform to resolve this issue?()A、Implement and test the solution

题目

A client is having problems connecting remotely after replacing a router. An administrator has just created an action plan. Which of the following is the NEXT step the administrator should perform to resolve this issue?()

  • A、Implement and test the solution.
  • B、Determine if escalation is necessary.
  • C、Identify the affected areas of the network.
  • D、Identify the results and effects of the solution

相似考题
更多“A client is having problems con”相关问题
  • 第1题:

    下列关于先张法预应力筋张拉程序的选项中,适用于钢筋的是( )。
    A、0→初应力→1.03σcon→0.9σcon→σcon(锚固)
    B、0→初应力→1.05σcon→0.9σcon→σcon(锚固)
    C、0→初应力→1.03σcon(持荷2min)→O→σcon(锚固)
    D、0→初应力→1.05σcon(持荷2min)→O→σcon(锚固


    答案:B
    解析:
    本题主要考查的是预应力张拉施工。0→初应力→1.05σcon→0.9σcon→σcon(锚固)。参见教材P35。

  • 第2题:

    先张法施工钢筋张拉时,应力应如何控制?()

    • A、0→初应力→1.05con(持荷2min)→0.9con→con(锚固)
    • B、0→初应力→0.9con→con(锚固)1.05con→(持荷2min)
    • C、0→初应力→0.9con→1.05con(持荷2min)→con(锚固)
    • D、0→初应力→0.9con→con(锚固)→1.05con(持荷2min)

    正确答案:A

  • 第3题:

    A section of the building has been having intermittent connectivity problems lately. An action plan and solution has been created. Which of the following steps would an administrator perform NEXT?()

    • A、Document the solution and process.
    • B、Establish the most probable cause.
    • C、Implement and test the solution.
    • D、Identify additional symptoms and problems

    正确答案:C

  • 第4题:

    A server is having problems accessing its presented storage on a SAN.  Which of the following could be causing the problem?()

    • A、NIC
    • B、HBA
    • C、Tape backup drive
    • D、SCSI adapter
    • E、CPU

    正确答案:A,B

  • 第5题:

    A client is having trouble connecting to the Internet. The client is using a static IP address and is able to connect to other devices on the network via IP address only. Which of the following is MOST likely the problem?()

    • A、IMAP
    • B、DHCP
    • C、DNS
    • D、NAT

    正确答案:C

  • 第6题:

    A server is having problems booting into the operating system.  Which of the following can provide important information to begin to trouble shoot the cause?()

    • A、 System logs
    • B、 Firmware updates
    • C、 POST messages
    • D、 Application logs

    正确答案:C

  • 第7题:

    SuSe Linux Enterprise Server (SLES) has been installed on an LPAR on a p5 570, but the client is having problems directly after installation with slow network performance. What is the most probable cause?()

    • A、SLES does not perform well with DHCP
    • B、SLES was installed with the default host name of Linux
    • C、Virtual Network Resources are being used, which is not supported in a SLES environment
    • D、The SLES instance was installed in 32-bit mode, where 64-bit should have been selected

    正确答案:B

  • 第8题:

    单选题
    先张法施工钢筋张拉时,应力应如何控制?()
    A

    0→初应力→1.05con(持荷2min)→0.9con→con(锚固)

    B

    0→初应力→0.9con→con(锚固)1.05con→(持荷2min)

    C

    0→初应力→0.9con→1.05con(持荷2min)→con(锚固)

    D

    0→初应力→0.9con→con(锚固)→1.05con(持荷2min)


    正确答案: D
    解析: 暂无解析

  • 第9题:

    单选题
    A server is having problems booting into the operating system.  Which of the following can provide important information to begin to trouble shoot the cause?()
    A

     System logs

    B

     Firmware updates

    C

     POST messages

    D

     Application logs


    正确答案: D
    解析: 暂无解析

  • 第10题:

    多选题
    Which client requests to the database can be captured as a part of the workload capture?()
    A

    flashback query

    B

    distributed transactions

    C

    logging in and logging out of sessions

    D

    all DDL statements having bind variables

    E

    direct path load of data from external files


    正确答案: E,D
    解析: 暂无解析

  • 第11题:

    单选题
    A server is having problems booting into the operating system. Which of the following can provide important information to begin to troubleshoot the cause?()
    A

    System logs

    B

    Firmware updates

    C

    POST messages

    D

    Application logs


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    In secondary schools every pupil having problems should ______.
    A

    know how to ask for help

    B

    be free from any pressure of academic work

    C

    be able to discuss his problems in class

    D

    be able to discuss his problems with any teacher


    正确答案: B
    解析:
    细节理解题。答案来自第一段:…good schools will make clear to every young person from the first year what guidance and personal help is available….

  • 第13题:

    下列关于先张法预应力筋张拉程序的选项中,适用于钢筋的是( )。
    A、0→初应力→1.03σcon(锚固)
    B、0→初应力→1.05σcon→0.9σcon→σcon(锚固)
    C、0→初应力→σcon (持荷2min锚固)
    D、O→初应力→ 1.05σcon(持荷2min)→O→σcon(锚固)


    答案:B
    解析:
    参见教材P35表2K312013-1。

  • 第14题:

    A consulting firm is locating 30 consultants at a client site for a nine-month project. What need does the firm have that can be met by a wireless solution?()

    • A、Providing a temporary network need
    • B、Ensuring secure presentations
    • C、Having freedom of movement within a network range
    • D、Augmenting an existing network

    正确答案:A

  • 第15题:

    An administrator is having problems with a server’s built-in I/O devices such as keyboard and USB ports. Which of the following is the BEST solution to resolve the problem?()

    • A、Upgrade to the latest security patch
    • B、Reinstall the operating system
    • C、Update the faulty equipment drivers
    • D、Upgrade to a new service pack

    正确答案:C

  • 第16题:

    A client has called with concerns that their computer problem has not been resolved by the onsite technician who has left. As the technicians supervisor, which of the following is the BEST course of action in this situation?()

    • A、Tell the client that they will need to place another service call.
    • B、Ask the client if they would like to discuss their computer problems in more detail.
    • C、Tell the client that another technician will be sent out.
    • D、Inform the client that the problem will be resolved by the onsite technician at another time.

    正确答案:A

  • 第17题:

    A user is having problems printing. The technician believes the printer may be out of ink. Which of the following troubleshooting steps should be performed NEXT?()

    • A、Establish a plan of action to resolve the problem
    • B、Implement the solution
    • C、Test the theory to determine cause
    • D、Verify full system functionality

    正确答案:C

  • 第18题:

    A customer is having problems after an AIX version upgrade from 5.2 to 5.3.  Which of the following should the pSeries technical specialist recommend that the customer call?()

    • A、IBM Techline
    • B、IBM Supportline
    • C、IBM Software Distribution
    • D、IBM Hardware Support

    正确答案:B

  • 第19题:

    Which client requests to the database can be captured as a part of the workload capture?()

    • A、flashback query
    • B、distributed transactions
    • C、logging in and logging out of sessions
    • D、all DDL statements having bind variables
    • E、direct path load of data from external files

    正确答案:C,D

  • 第20题:

    单选题
    对于夹片式具有自锚性能的锚具,先张法低松弛力筋张拉程序为    (    )
    A

    0→初应力→1.05σcon→0.9σcon→σcon(锚固)

    B

    0→初应力→1.05σcon(持荷2min)→0→σcon(锚固)

    C

    0→初应力→1.03σcon(锚固)

    D

    0→初应力→σcon(持荷2min锚固)


    正确答案: D
    解析:

  • 第21题:

    单选题
    Your company has an Active Directory Domain Services (AD DS) domain. All servers run Windows Server 2008 R2. All client computers run Windows 7. Remote client computers are not members of the domain. Your environment includes a Remote Desktop Gateway (RD Gateway) server. You install an application on a Remote Desktop Session Host (RD Session Host) server. You need to ensure that remote users can run the application. What should you do?()
    A

    On each remote client computer, configure the Remote Desktop Connection client to connect to the RD Gateway server.

    B

    On each remote client computer, configure the Remote Desktop Connection client to connect without warning if server authe ntication fails.

    C

    On the RD Session Host server, configure the Remote Desktop Connection client to connect to the RD Gateway server.

    D

    On the RD Gateway server, add the Guests local group to the Remote Desktop Users local group.


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    We're having some()problems with our new computer.
    A

    teeth

    B

    tooth

    C

    teethe

    D

    teething


    正确答案: B
    解析: 暂无解析

  • 第23题:

    单选题
    A Windows Communication Foundation (WCF) service has a callback contract. You are developing a client application that will call this service.You must ensure that the client application can interact with the WCF service. What should you do?()
    A

    On the OperationContractAttribute, set the AsyncPattern property value to true.

    B

    On the OperationContractAttribute, set the ReplyAction property value to the endpoint address of the client.

    C

    On the client, create a proxy derived from DuplexClientBase<TChannel >.

    D

    On the client, use GetCallbackChannel<T >.


    正确答案: D
    解析: 暂无解析