Add CUoD memory.
Provide CUoD processors.
Provide redundant disks on separate SCSI buses.
Add redundant power supplies in the p5-570 CEC (Central Electronics Complex).
第1题:
The pSeries technical specialist just finished reviewing the system configurations with the customer. The customer requested that many of the availability options,initially configured,be removed due to budgetary constraints. What should be done next?()
第2题:
A storage specialist is proposing a solution consisting of an IBM System Storage TS3200 TapeLibrary and a SAN Volume Controller, both of which are being added to a customer’s existing SANenvironment for the first time. Which of the following should be completed before the proposal ispresented to the customer?()
第3题:
A customer needs three 2-way application servers and is evaluating the purchase of three p5-520s versus one partitioned 6-way p5-570. They like the benefits provided with dynamic processor sparing. What information should the pSeries technical specialist emphasize to the customer?()
第4题:
A Sales Specialist receives an email from a customer, requesting information on IBM’s best Server Consolidation solution. How should the Sales Specialist proceed? ()
第5题:
Which of the following situations would suggest to a System x Sales Specialist that the customer could benefit from an iSCSI solution?()
第6题:
Reboot the system.
Check the file system sizes.
Have the customer repeat the task to recreate the problem.
Inform the customer that no problems were found, and to call back if the problem reoccurs.
第7题:
Add CUoD memory.
Provide CUoD processors.
Provide redundant disks on separate SCSI buses.
Add redundant power supplies in the p5-570 CEC (Central Electronics Complex).
第8题:
PowerVM Standard Edition on POWER6 hardware
PowerVM Standard Edition with POWER5 hardware
PowerVM Enterprise Edition with POWER6 hardware
PowerVM Enterprise Edition with POWER5 hardware
第9题:
The p5-570 offers CoD processors.
The p5-570 requires more rack space than the three p5-520s.
Redundant power is standard on the p5-570 and is optional on the p5-520.
Operating system charges will be less expensive with the p5-520 solution.
第10题:
Submitted an RPQ (Request for Quote) for AIX v5.1 support on a p5-570
Designed a p670 because it supports AIX 5.1 partitions
Initially designed a solution supporting AIX 5.1 partitions
Gained customer approval for the final design prior to ordering the system
第11题:
Recommend the customer call EMC.
Recommend the customer call IBM hardware support.
Recommend the customer contact SupportLine.
Recommend the customer re-creates the volume groups.
第12题:
RAID 3
RAID 5
RAID 6
RAID 10
第13题:
A customer had been given a proposal for a p5-570 6-way 32GB system running in Full Partition mode. After review, the customer asked that the configuration be modified to enhance the reliability and availability of the solution. However, the customer does not want to pay for HACMP or additional machines. What change would be most likely to improve the reliability of the solution?()
第14题:
A customer requires an 8-way 16GB AIX system. They are evaluating the following three systems: ? p5-570 ? p5-570 Express ? p650 The pSeries technical specialist has been asked to explain the pros and cons of the three solutions. What information will help the customer decide on the best solution for their environment?()
第15题:
A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility. Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()
第16题:
A customer indicates that a system is experiencing printing problems. After checking the system, and successfully printing, no problem has been found. Which of the following procedures should be performed next to further clarify the problem?()
第17题:
Remove the availability options,as requested, and place the systems on order.
Keep the availability options in the configurations and engage the pricer to provide deep discounting on the solution.
Remove the availability options and review the new configurations with the customer,highlighting the potential exposures.
Keep the availability options in the configurations, knowing that these options may prevent a critical situation in the future.
第18题:
A
B
C
D
第19题:
Send the customer information on VMware
Send the customer information on IBM BladeCenter
Call the customer to ask why they are consolidating
Send the customer information on IBM System P
第20题:
Propose VMware with Linux on Intel as a solution.
Provide a special bid on the System x servers.
Include migration services within the proposal.
Provide a warranty offering with guaranteed fix levels.
第21题:
The customer is looking for a fibre SAN solution to increase reliability and performance.
The customer wants to implement an energy-efficient solution to comply with their Go Green initiative.
The customer is cost-conscious and is looking for a centralized storage solution.
The customer is a large telecommunications firm and is looking to centralize storage for all their System x,System p,and mainframe servers.
第22题:
IBM Standalone Solutions Configuration Tool (SSCT )
Server Proven
Configuration Options Guide (COG)
xREF (System X reference)
第23题:
TDA
Capacity Magic
business case review
SAN configuration review
第24题:
IBM Standalone Solutions Configuration Tool (SSCT)
IBM Server Proven
IBM System x Reference Sheets (xREF)
IBM Sizing Guides