单选题A customer has just obtained a second data center through the acquisition of a competitor.   The IT Director is now seeking to merge,integrate,and rebalance systems across the two data centers over thenext two years.   They have just deployed a high-sp

题目
单选题
A customer has just obtained a second data center through the acquisition of a competitor.   The IT Director is now seeking to merge,integrate,and rebalance systems across the two data centers over thenext two years.   They have just deployed a high-speed point-to-point circuit between the facilities. The IT Director would like a system that could backup their AIX and Win2K servers and electronically vault the data between sites as part of their Disaster Recovery Plan.   What product should the pSeries technical specialist recommend for this requirement?()
A

CSM

B

TSM

C

NIM

D

Sysback


相似考题
更多“单选题A customer has just obtained a second data center through the acquisition of a competitor.   The IT Director is now seeking to merge,integrate,and rebalance systems across the two data centers over thenext two years.   They have just deployed a high-sp”相关问题
  • 第1题:

    A customer has two locations that host their pSeries servers.  Traffic is being routed through the public Internet.  The customer needs to exchange confidential financial data between the servers.  Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()

    • A、A DCE domain
    • B、A Kerberos domain
    • C、A PPP tunnel between the servers
    • D、An IPSEC tunnel between the servers

    正确答案:D

  • 第2题:

    A customer has just obtained a second data center through the acquisition of a competitor.   The IT Director is now seeking to merge,integrate,and rebalance systems across the two data centers over thenext two years.   They have just deployed a high-speed point-to-point circuit between the facilities. The IT Director would like a system that could backup their AIX and Win2K servers and electronically vault the data between sites as part of their Disaster Recovery Plan.   What product should the pSeries technical specialist recommend for this requirement?()

    • A、CSM
    • B、TSM
    • C、NIM
    • D、Sysback

    正确答案:B

  • 第3题:

    A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()

    • A、Purchase a second HMC and use this to manage the new servers.
    • B、Connect all of the new servers to the existing private HMC network.
    • C、Configure a second private network on their existing HMC for the new servers.
    • D、Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.

    正确答案:B

  • 第4题:

    A customer requires an infrastructure to support disaster recovery of critical applications between two remote data centers. One data center is in Tokyo and one is in Beijing. The customer’s Recovery Point Objective (RPO) requires a six-hour window for a bandwidth of 100 MB/s and a new storage system for a total of 4 TB of data. They estimate 100 MB of new data produced hourly. What data synchronization method would be recommended to meet the requirements()

    • A、Metro Mirror
    • B、FlashCopy
    • C、Global Mirror
    • D、Snapshot

    正确答案:C

  • 第5题:

    A customer has systems with AIX 6.1 and 5.3 distributed across two data centers located 8km apart. They want to implement high availability with automated application restart and synchronous data replication between the IBM Systems Storage DS8700 systems which are installed in each datacenter. Which solution addresses the customer requirements?()

    • A、Use the Geographic Logical Volume Manager (GLVM) for MetroMirror, and Live Partition Mobility to automate partition migration upon failure
    • B、Use MetroMirror for the AIX volumes and High Availability Disaster Recovery (HADR) to automate partition migration and restart upon failure.
    • C、Use the Geographic Logical Volume Manager (GLVM) for MetroMirror to replicate the data between the two sites and automate application recovery.
    • D、Use MetroMirror for the AIX volumes, and PowerHA SystemMirror Enterprise Edition to automate failover of MetroMirror pairs and automate application recovery.

    正确答案:D

  • 第6题:

    Your network contains two data centers named Datacenter1 and Datacenter2. An Active Directory site exists for each data center.  The data centers connect to the Internet by using a direct link.  The data centers connect to each other by using a high-speed WAN link.  You plan to deploy Exchange Server 2010 Mailbox servers in both data centers. You need to plan message routing to meet the following requirements:.Ensure outbound delivery of e-mail messages if a single server fails .Automatically load balance the Hub Transport server in each site .Deploy the minimum number of servers What should you include in the plan?()

    • A、In each data center, deploy one Hub Transport server. Create and configure one Send connector.
    • B、In each data center, deploy two Hub Transport servers. Create and configure one Send connector.
    • C、In each data center, deploy one Edge Transport server. Create and configure two Send connectors.
    • D、In each data center, deploy two Edge Transport servers. Create and configure two Send connectors.

    正确答案:B

  • 第7题:

    单选题
    Two DS8700 systems have been proposed for a disk-to-disk BC solution. Each system has 200 TB installed, with a data change rate of 18% per day. Two 2 Gbps CWDM links are in place between the remote data centers with an average utilization rate of 55%. The proposed solution   includes additional CWDM ports.  Which of the following should justify the additional CWDM ports()
    A

    the Disk Magic configuration report

    B

    an engineer from thetelcom providing the dark fiber

    C

    the bandwidth calculations

    D

    aCompeteLine analysis


    正确答案: C
    解析: 暂无解析

  • 第8题:

    单选题
    A customer’s SAN environment has undergone significant growth over the past two years. They have also suffered a high turnover rate with administrative personnel. The customer has asked a storage specialist for help in documenting and understanding their changing SAN environment. The ability to make configuration changes to devices would be a plus.  Which tool should the storage specialist suggest()
    A

    Tivoli Storage Productivity Center Fabric Manager

    B

    Tivoli Storage Productivity Center Basic Edition

    C

    IBM TivoliNetView

    D

    Disk Magic


    正确答案: C
    解析: 暂无解析

  • 第9题:

    单选题
    Your network contains two data centers named Datacenter1 and Datacenter2. An Active Directory site exists for each data center.  The data centers connect to the Internet by using a direct link.  The data centers connect to each other by using a high-speed WAN link.  You plan to deploy Exchange Server 2010 Mailbox servers in both data centers. You need to plan message routing to meet the following requirements:.Ensure outbound delivery of e-mail messages if a single server fails .Automatically load balance the Hub Transport server in each site .Deploy the minimum number of servers What should you include in the plan?()
    A

    In each data center, deploy one Hub Transport server. Create and configure one Send connector.

    B

    In each data center, deploy two Hub Transport servers. Create and configure one Send connector.

    C

    In each data center, deploy one Edge Transport server. Create and configure two Send connectors.

    D

    In each data center, deploy two Edge Transport servers. Create and configure two Send connectors.


    正确答案: A
    解析: 暂无解析

  • 第10题:

    单选题
    A customer has systems with AIX 6.1 and 5.3 distributed across two data centers located 8km apart. They want to implement high availability with automated application restart and synchronous data replication between the IBM Systems Storage DS8700 systems which are installed in each datacenter. Which solution addresses the customer requirements?()
    A

    Use the Geographic Logical Volume Manager (GLVM) for MetroMirror, and Live Partition Mobility to automate partition migration upon failure

    B

    Use MetroMirror for the AIX volumes and High Availability Disaster Recovery (HADR) to automate partition migration and restart upon failure.

    C

    Use the Geographic Logical Volume Manager (GLVM) for MetroMirror to replicate the data between the two sites and automate application recovery.

    D

    Use MetroMirror for the AIX volumes, and PowerHA SystemMirror Enterprise Edition to automate failover of MetroMirror pairs and automate application recovery.


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    A global customer’s IT strategy is based upon two DS8000 systems and an N series gateway. They want to protect their  business by implementing a disaster recovery solution. The storage specialist has recommended cascaded mirroring.  Which of the following is the business benefit of cascaded replication()
    A

    it is cost efficient, as a single N series or DS8000 can have its controllers split between the  primary and secondary site and use semi- synchronousmirroring while using asynchronous mirroring to a third site

    B

    the second site acts as a repeater station so that greater geographical distances can be achieved

    C

    ITprovides high availability together with disaster recovery by implementing Metro/Global Mirror across three geographically dispersed systems

    D

    it guarantees data protection by implementing two synchronous copies of the primary site data


    正确答案: A
    解析: 暂无解析

  • 第12题:

    单选题
    A customer has a Fibre Channel switch residing in a configuration where both production and test data coexist. Which of the following is the simplest method for ensuring that the two types of data do not flow through the same port?()
    A

    VLAN

    B

    zoning

    C

    trunking

    D

    LUN masking


    正确答案: B
    解析: 暂无解析

  • 第13题:

    A global customer’s IT strategy is based upon two DS8000 systems and an N series gateway. They want to protect their  business by implementing a disaster recovery solution. The storage specialist has recommended cascaded mirroring.  Which of the following is the business benefit of cascaded replication()

    • A、it is cost efficient, as a single N series or DS8000 can have its controllers split between the  primary and secondary site and use semi- synchronousmirroring while using asynchronous mirroring to a third site
    • B、the second site acts as a repeater station so that greater geographical distances can be achieved
    • C、ITprovides high availability together with disaster recovery by implementing Metro/Global Mirror across three geographically dispersed systems
    • D、it guarantees data protection by implementing two synchronous copies of the primary site data

    正确答案:C

  • 第14题:

    A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site.  Which IBM System Storage DS8000 solution should the storage  specialist propose to the client()

    • A、Metro/Global Mirror
    • B、Metro Mirror
    • C、Global Copy
    • D、Global Mirror

    正确答案:D

  • 第15题:

    Due to a recent change in government regulations, Company.com needs to create two  independent but synchronized copies of their data. These copies must be contained in separate storage device a minimum of 100 km apart. The customer has capacity in two systems that meet the criteria, one with SSA disk and the other is FAStT.  What facility can be used to manage this issue?()

    • A、 Two independent copies of the data can be created and synchronized using the "HACMP/XD://HAGeo"
    • B、 The existing disks can be incorporated a single storage unit using the optional product "HACMP/XD://PPRC"
    • C、 AIX can create a mirrored logical volume across the two systems that would be accessible from either system
    • D、 AIX can use the multi path IO subsystem to spread the information across the devices and keep the copies separated

    正确答案:A

  • 第16题:

    Two DS8700 systems have been proposed for a disk-to-disk BC solution. Each system has 200 TB installed, with a data change rate of 18% per day. Two 2 Gbps CWDM links are in place between the remote data centers with an average utilization rate of 55%. The proposed solution   includes additional CWDM ports.  Which of the following should justify the additional CWDM ports()

    • A、the Disk Magic configuration report
    • B、an engineer from thetelcom providing the dark fiber
    • C、the bandwidth calculations
    • D、aCompeteLine analysis

    正确答案:C

  • 第17题:

    A customer would like to implement an IBM System Storage DS8000 solution. A Capacity Magic study has determined that 500 drives of 450 GB are required to meet the customer’s capacity requirements. Limited space is available for additional systems in the data center.  Which solution  best meets the customer’s requirements()

    • A、DS8800 system with three frames
    • B、DS8800 system with one frame
    • C、DS8700 system with two frames
    • D、DS8800 system with two frames

    正确答案:D

  • 第18题:

    单选题
    Due to a recent change in government regulations, Company.com needs to create two  independent but synchronized copies of their data. These copies must be contained in separate storage device a minimum of 100 km apart. The customer has capacity in two systems that meet the criteria, one with SSA disk and the other is FAStT.  What facility can be used to manage this issue?()
    A

     Two independent copies of the data can be created and synchronized using the HACMP/XD://HAGeo

    B

     The existing disks can be incorporated a single storage unit using the optional product HACMP/XD://PPRC

    C

     AIX can create a mirrored logical volume across the two systems that would be accessible from either system

    D

     AIX can use the multi path IO subsystem to spread the information across the devices and keep the copies separated


    正确答案: D
    解析: 暂无解析

  • 第19题:

    单选题
    A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()
    A

    Purchase a second HMC and use this to manage the new servers.

    B

    Connect all of the new servers to the existing private HMC network.

    C

    Configure a second private network on their existing HMC for the new servers.

    D

    Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.


    正确答案: B
    解析: 暂无解析

  • 第20题:

    单选题
    A customer has two locations that host their pSeries servers.  Traffic is being routed through the public Internet.  The customer needs to exchange confidential financial data between the servers.  Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()
    A

    A DCE domain

    B

    A Kerberos domain

    C

    A PPP tunnel between the servers

    D

    An IPSEC tunnel between the servers


    正确答案: A
    解析: 暂无解析

  • 第21题:

    单选题
    A customer requires an infrastructure to support disaster recovery of critical applications between two remote data centers. One data center is in Tokyo and one is in Beijing. The customer’s Recovery Point Objective (RPO) requires a six-hour window for a bandwidth of 100 MB/s and a new storage system for a total of 4 TB of data. They estimate 100 MB of new data produced hourly. What data synchronization method would be recommended to meet the requirements()
    A

    Metro Mirror

    B

    FlashCopy

    C

    Global Mirror

    D

    Snapshot


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site.  Which IBM System Storage DS8000 solution should the storage  specialist propose to the client()
    A

    Metro/Global Mirror

    B

    Metro Mirror

    C

    Global Copy

    D

    Global Mirror


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    A customer would like to implement an IBM System Storage DS8000 solution. A Capacity Magic study has determined that 500 drives of 450 GB are required to meet the customer’s capacity requirements. Limited space is available for additional systems in the data center.  Which solution  best meets the customer’s requirements()
    A

    DS8800 system with three frames

    B

    DS8800 system with one frame

    C

    DS8700 system with two frames

    D

    DS8800 system with two frames


    正确答案: B
    解析: 暂无解析