单选题As a rule of thumb for QA (Quality Assurance) activities, how many hours of downstream QA (Quality Assurance) costs are saved for each hour spent on technical reviews early in the project?()A Up to 5B Up to 10C Up to 15D Up to 20

题目
单选题
As a rule of thumb for QA (Quality Assurance) activities, how many hours of downstream QA (Quality Assurance) costs are saved for each hour spent on technical reviews early in the project?()
A

Up to 5

B

Up to 10

C

Up to 15

D

Up to 20


相似考题
参考答案和解析
正确答案: B
解析: 暂无解析
更多“单选题As a rule of thumb for QA (Quality Assurance) activities, how many hours of downstream QA (Quality Assurance) costs are saved for each hour spent on technical reviews early in the project?()A Up to 5B Up to 10C Up to 15D Up to 20”相关问题
  • 第1题:

    112 Of the following, who has the ultimate responsibility for meeting project quality objectives?

    A. Project Engineer

    B. Project Manager

    C. Functional Manager

    D. Quality Assurance Manager

    E. Project Owner


    正确答案:B

  • 第2题:

    87 The key ingredient to a successful quality management program are _____.

    A. management's quality philosophy, operational quality assurance and operational quality control. B. quality evaluation methods and functional quality integrators.

    C. technical quality administration, the technical quality specifications, and the quality process review. D. quality evaluation methods, quality progress reviews and the technical quality specifications.

    E. All of the above


    正确答案:A

  • 第3题:

    ● (73)is the application of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements.

    (73)

    A. Quality assurance (QA)

    B. Quality planning

    C. Quality control (QC)

    D. Quality costs


    正确答案:A

  • 第4题:

    ______is the application of planned,systematic quality activities to ensure that the project will employ all processes needed to meet requirements.

    A.euality assurance(QA)

    B.Quality planning

    C.Quality control(QC)

    D.Quality costs


    正确答案:A
    解析:质量计划是质量管理的一部分,致力于制定质量目标,并规定必要的运行过程和相关资源以实现项目质量目标。
      质量控制就是项目团队的管理人员采取有效措施,监督项目的具体实施结果,判断它们是否符合项目有关的质量标准,并消除产生不良结果原因的途径。
      质量成本是指为满足质量要求所付出的主要成本。
      质量保证是通过对质量计划的系统实施,确保项目需要的相关过程达到预期要求的质量活动。选项A是质量保证(QA),选项B是质量计划,选项C是质量控制(QC),选项D是质量成本。因此应选择A。

  • 第5题:

    ● ()is the application ion of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements.()A. Quality assurance (QA) B. Quality planningC. Quality control (QC) D. Quality costs


    正确答案:A
    质量保证是一项有计划的、系统的质量活动,以确保项目的所有过程达到并符合要求。

  • 第6题:

    ( ) is the application of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements.

    A.Quality assurance(QA)
    B.Quality planning
    C.Quality control(QC)
    D.Quality costs

    答案:A
    解析:
    质量计划是质量管理的一部分,致力于制定质量目标,并规定必要的运行过程和相关资源以实现项目质量目标。
    质量控制就是项目团队的管理人员采取有效措施,监督项目的具体实施结果,判断它们是否符合项目有关的质量标准,并消除产生不良结果原因的途径。
    质量成本是指为满足质量要求所付出的主要成本。
    质量保证是通过对质量计划的系统实施,确保项目需要的相关过程达到预期要求的质量活动。选项A是质量保证(QA),选项B是质量计划,选项C是质量控制(QC),选项D是质量成本。因此应选择A。

  • 第7题:

    ()is the application of planned,systematic quality activities to ensure thatthe project will employ all processes needed to meet requirements.

    A.Quality assurance(QA)
    B.Quality planning
    C.Quality control(QC)
    D.Quality costs

    答案:A
    解析:
    质量计划是质量管理的一部分,致力于制定质量目标,并规定必要的运行过程和相关资源以实现项目质量目标。质量控制就是项目团队的管理人员采取有效措施,监督项目的具体实施结果,判断它们是否符合项目有关的质量标准,并消除产生不良结果原因的途径。质量成本是指为满足质量要求所付出的主要成本。质量保证是通过对质量计划的系统实施,确保项目需要的相关过程达到预期要求的质量活动。选项 A 是质量保证(QA),选项B 是质量计划,选项 C 是质量控制(QC),选项 D 是质量成本。因此应选择 A。

  • 第8题:

    The wireless lan controller maintains up to how many controller crash files?()

    • A、20
    • B、5
    • C、15
    • D、10

    正确答案:B

  • 第9题:

    质量保证(quality assurance,QA)


    正确答案: 为一产品或服务满足特定的质量要求提供充分可信性所要求的有计划的和系统的措施。

  • 第10题:

    Your workgroup’s project is critical and there is no time for rebuilding the Windows 2000 Professional desktops in case of disaster. Your company has not yet established automated system replacement that Windows 2000 can provide. What is your most comprehensive option for disaster recovery at this time?()

    • A、Back up each project desktop with the System State option enabled.
    • B、Back up everything on each desktop as a backup option and perform this daily. Create an Emergency Repair Disk weekly to keep the registry backup current.
    • C、Back up everything on each desktop as a backup option and perform this daily.
    • D、Back up each project desktop with the System State option enabled, including the systerotected files.

    正确答案:A

  • 第11题:

    名词解释题
    质量保证(quality assurance,QA)

    正确答案: 为一产品或服务满足特定的质量要求提供充分可信性所要求的有计划的和系统的措施。
    解析: 暂无解析

  • 第12题:

    单选题
    _____, they did not know that it is a very serious matter to wake up guests at early hours.
    A

    Unimportantly

    B

    Unfortunately

    C

    Unassumingly

    D

    Unimaginably


    正确答案: A
    解析:
    unfortunately不幸地。unimportantly不重要地是。unassumingly谦逊地。unimaginably想象不到地,不可思议地。

  • 第13题:

    121 The quality objectives are approved in the conceptual stage of the project by the:

    A. Project Engineer

    B. Project Manager

    C. Functional Manager

    D. Quality Assurance Manager

    E. Project Owner


    正确答案:E

  • 第14题:

    —Why do you get up so early in the morning,Tarcy?

    —I generally make it a to be up by 7 to read English.

    A.plan B.wish C.secret D.rule


    正确答案:D

  • 第15题:

    ●To ensure the project team provides the functionality the customerexpects in a new piece of software, the project manager ask the customer forsign-off on the design criteria. These documents are(75).

    (75) A. technical specifications

    B. performance specifications

    C. product descriptions

    D. quality assurance


    正确答案:A

  • 第16题:

    Performing( )involves monitoring specific project results to determine ifthey comply with relevant quality standards and identifying ways to eliminate causes ofunsatisfactory results。 A.quality planning B.quality assurance C.quality performance D.quality control


    正确答案:D
    执行质量控制(quality control)指监控具体的项目结果,确定其是否符合相关的质量标准,并判断如何杜绝造成不合格结果的根源。

  • 第17题:

    Many new buildings are ( ) the Su zhou River.

    A、setting up by

    B、putting up on

    C、going up on

    D、building up by


    参考答案:C

  • 第18题:

    To ensure the project team provide the functionlity the customer expects in a new prece of software, the project manager ask the customer for sing-off on the design crieria.There documents are()

    A.technical speifications
    B.performance specifications
    C.product descriptions
    D.quality assurance

    答案:A
    解析:
    为了确保项目团队提供的软件功能符合客户的期望,项目经理要求客户确认设计标准,这个文档就是技术规格说明书。

  • 第19题:

    The wlan controller maintains up to how many controller crash files?()

    • A、10
    • B、5
    • C、15
    • D、20

    正确答案:B

  • 第20题:

    As a rule of thumb for QA (Quality Assurance) activities, how many hours of downstream QA (Quality Assurance) costs are saved for each hour spent on technical reviews early in the project?()

    • A、Up to 5
    • B、Up to 10
    • C、Up to 15
    • D、Up to 20

    正确答案:B

  • 第21题:

    The cisco wireless location appliance provides an audit trail for each device tracked for up to how many days?()

    • A、45
    • B、60
    • C、15
    • D、30

    正确答案:D

  • 第22题:

    单选题
    As a rule of thumb for QA (Quality Assurance) activities, how many hours of downstream QA (Quality Assurance) costs are saved for each hour spent on technical reviews early in the project?()
    A

    Up to 5

    B

    Up to 10

    C

    Up to 15

    D

    Up to 20


    正确答案: B
    解析: 暂无解析

  • 第23题:

    单选题
    Your workgroup’s project is critical and there is no time for rebuilding the Windows 2000 Professional desktops in case of disaster. Your company has not yet established automated system replacement that Windows 2000 can provide. What is your most comprehensive option for disaster recovery at this time?()
    A

    Back up each project desktop with the System State option enabled.

    B

    Back up everything on each desktop as a backup option and perform this daily. Create an Emergency Repair Disk weekly to keep the registry backup current.

    C

    Back up everything on each desktop as a backup option and perform this daily.

    D

    Back up each project desktop with the System State option enabled, including the systerotected files.


    正确答案: A
    解析: 暂无解析

  • 第24题:

    单选题
    How should you signal the crane operator to raise the boom?().
    A

    Extend arm with the thumb pointing up and flex the fingers in and out

    B

    Place both fists in front of the body with the thumbs pointing upward

    C

    With forearm vertical and forefinger pointing up,move hand in small horizond circles

    D

    Extend arm with the fingers closed and thumb upward


    正确答案: A
    解析: 暂无解析