单选题A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?()A 0B 1C 2D 4

题目
单选题
A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?()
A

0

B

1

C

2

D

4


相似考题
参考答案和解析
正确答案: C
解析: 暂无解析
更多“单选题A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?()A 0B 1C 2D 4”相关问题
  • 第1题:

    A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?()

    A.0

    B.1

    C.2

    D.4


    参考答案:A

  • 第2题:

    A bank has requested proposals for a storage solution to upgrade their disaster recoveryprocesses for their System z, UNIX, and Microsoft Windows environment. The solution mustsimulate a multi-site environment and provide the customer the ability to explore Metro Mirror,Global Mirror, Global Mirror for z/OS, and FlashCopy. Floor space is limited. Which solution bestmeets the specified requirements?()

    • A、Two IBM System Storage DS8100 systems
    • B、One IBM System Storage DS8300 with two LPARs
    • C、Two IBM System Storage DS6800 systems in a single rack
    • D、One IBM System Storage DS6800 for System z, and SVC for UNIX and Windows

    正确答案:B

  • 第3题:

    When planning an SVC environment with the customer, the storage specialist finds that they wishto include iSCSI storage into the cluster. In this situation what is needed to place the storage intoproduction?()

    • A、a RAID card
    • B、IQN of the host
    • C、amount of storage
    • D、number of I/O groups

    正确答案:B

  • 第4题:

    A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()

    • A、operator training
    • B、cache size of the two clusters
    • C、fibre bandwidth capability between the sites
    • D、number of stacked tape drives attached to each cluster

    正确答案:C

  • 第5题:

    A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increase the throughput available to the ESX servers. What configuration setting does the storage specialist need to highlight?()

    • A、increase the buffer credits on the HBAs
    • B、increase the number of device logins on the ESX servers
    • C、additional paths will be required between the servers and storage
    • D、multipath option on the ESX servers should be changed to round-robin

    正确答案:D

  • 第6题:

    A current N series customer has an IBM System Storage N3600. They are interested in futureexpansion. What is the minimum number of disk drives required to populate the expansion shelf?()

    • A、0
    • B、1
    • C、4
    • D、14

    正确答案:A

  • 第7题:

    A customer is planning a PowerHA cluster split across two sites. The sites are located 10km apart. There is aDS8000 storage array at each site with SAN connectivity between the two arrays. There are only enough IPinterfaces for one IP network in this cluster. How can they ensure that disk data is automatically mirrored and synchronized between sites?()

    • A、Purchase PowerHA/XD license
    • B、Purchase PowerHA with GLVM license
    • C、Implement PowerHA with split-site LVM
    • D、Implement PowerHA with cross-site LVM

    正确答案:D

  • 第8题:

    单选题
    During Company.com planning session,Company.com presents the details of the current  Network design. The network design serves four separate company facilities, each on as separate subnet. As part of a disaster recovery plan, the customer is evaluating the use of HACMP. Specifically, the have reviewed IPAT via IP aliasing and are questioning the number of IP subnets required.  Given the customer’s current configuration,what is the recommended minimum number of IP subnets that would be required?()
    A

     4

    B

     5

    C

     6

    D

     8


    正确答案: D
    解析: 暂无解析

  • 第9题:

    单选题
    Node ’A’ and ’B’ have two network adapters connected to different networks. Adapter 1 is assigned the address 192.168.0.10 with a subnet mask of 255.255.255.0. Adapter 2 is assigned the address 24.76.1.200 with a subnet mask of 255.255.240.0.  What is the minimum number of additional adapters per node required to eliminate a network adapter as a single point of failure?()
    A

     One adapter per node

    B

     Two adapters per node

    C

     Four adapters per node

    D

     No additional adapters per node


    正确答案: A
    解析: 暂无解析

  • 第10题:

    单选题
    A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()
    A

    operator training

    B

    cache size of the two clusters

    C

    fibre bandwidth capability between the sites

    D

    number of stacked tape drives attached to each cluster


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    An architect is configuring a PowerHA cluster in the following way:The cluster will consist of two nodes. Each node will have two boot interfaces configured as a single PowerHA network. The cluster is to have asingle resource group with a single service address.Heartbeating over aliased is not to be used. What is the minimum number of subnets required to implement this cluster?()
    A

    1

    B

    2

    C

    3

    D

    4


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    A bank has requested proposals for a storage solution to implement disaster recovery processes for their IBM System z configured with Linux, IBM System p configured with AIX, and Microsoft Windows environments. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, and FlashCopy. Floor space is limited. What hardware platform provides this native support?()
    A

    IBM XIV Storage System

    B

    IBM System Storage DS5300

    C

    IBM System Storage DS8800

    D

    IBM System Storage DS5020 with SVC


    正确答案: C
    解析: 暂无解析

  • 第13题:

    A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration:  (1)two Brocade 20-Port SAN Switch Modules  (2)two Nortel Networks 1/10 GB Uplink ESM  (3)a redundant AMM  What is the minimum number of power supplies needed for this configuration to have full redundancy?()

    • A、4
    • B、3
    • C、2
    • D、8

    正确答案:A

  • 第14题:

    Node ’A’ and ’B’ have two network adapters connected to different networks. Adapter 1 is assigned the address 192.168.0.10 with a subnet mask of 255.255.255.0. Adapter 2 is assigned the address 24.76.1.200 with a subnet mask of 255.255.240.0.  What is the minimum number of additional adapters per node required to eliminate a network adapter as a single point of failure?()  

    • A、 One adapter per node
    • B、 Two adapters per node
    • C、 Four adapters per node
    • D、 No additional adapters per node

    正确答案:B

  • 第15题:

    A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?()

    • A、0
    • B、1
    • C、2
    • D、4

    正确答案:A

  • 第16题:

    During Company.com planning session,Company.com presents the details of the current  Network design. The network design serves four separate company facilities, each on as separate subnet. As part of a disaster recovery plan, the customer is evaluating the use of HACMP. Specifically, the have reviewed IPAT via IP aliasing and are questioning the number of IP subnets required.  Given the customer’s current configuration,what is the recommended minimum number of IP subnets that would be required?()

    • A、 4
    • B、 5
    • C、 6
    • D、 8

    正确答案:C

  • 第17题:

    A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()

    • A、Two dual-port PCIe adapters
    • B、A four-port PCIe Ethernet adapter
    • C、Four separate PCIe Ethernet adapters
    • D、Two embedded Integrated Virtual Ethernet adapters (IVE)

    正确答案:C

  • 第18题:

    A customer has two separate storage islands and is planning to implement an SVC to provide forFlashCopy between the two islands. What is the minimum number of inter-switch links (ISLs) thatare required?()

    • A、0
    • B、1
    • C、2
    • D、4

    正确答案:A

  • 第19题:

    A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server. Which limitation must be considered when planning the system configuration?()

    • A、A VIO server requires a dedicated LHEA port.
    • B、There is a limit of 32 LPARs per virtual LAN.
    • C、Two VIO servers will be required. A single VIO server can only provide virtual storage or virtual Ethernet.
    • D、Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.

    正确答案:A

  • 第20题:

    单选题
    A customer has two separate storage islands and is planning to implement an SVC to provide forFlashCopy between the two islands. What is the minimum number of inter-switch links (ISLs) thatare required?()
    A

    0

    B

    1

    C

    2

    D

    4


    正确答案: B
    解析: 暂无解析

  • 第21题:

    单选题
    A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration:  (1)two Brocade 20-Port SAN Switch Modules  (2)two Nortel Networks 1/10 GB Uplink ESM  (3)a redundant AMM  What is the minimum number of power supplies needed for this configuration to have full redundancy?()
    A

    4

    B

    3

    C

    2

    D

    8


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increase the throughput available to the ESX servers. What configuration setting does the storage specialist need to highlight?()
    A

    increase the buffer credits on the HBAs

    B

    increase the number of device logins on the ESX servers

    C

    additional paths will be required between the servers and storage

    D

    multipath option on the ESX servers should be changed to round-robin


    正确答案: C
    解析: 暂无解析

  • 第23题:

    单选题
    A current N series customer has an IBM System Storage N3600. They are interested in futureexpansion. What is the minimum number of disk drives required to populate the expansion shelf?()
    A

    0

    B

    1

    C

    4

    D

    14


    正确答案: B
    解析: 暂无解析