单选题The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()A capacity above 500 TBB first in customer locationC a new model has been releasedD sold without implem

题目
单选题
The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()
A

capacity above 500 TB

B

first in customer location

C

a new model has been released

D

sold without implementation service


相似考题
更多“单选题The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()A capacity above 500 TBB first in customer locationC a new model has been releasedD sold without implem”相关问题
  • 第1题:

    An IBM Business Partner suggests an IBM System Storage DS8000 to a customer with a SAN   that is now configured with an EMC Symmetrix subsystem disk.  The customer wants to determine if new HBAs and software upgrades are needed on the servers if the EMC storage is replaced by the DS8000 What document must be carefully read to help address the customer’s concerns()

    • A、IBM System Storage DS8000: Host Systems Attachment Guide
    • B、DS8000 Interoperability Matrix
    • C、IBM System Storage DS8000: Introduction and Planning Guide
    • D、IBM System Storage Solution Handbook

    正确答案:B

  • 第2题:

    An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()

    • A、The EMC storage specialist has not participated in the TDA meeting
    • B、The FC HBAs are 4 Gbps technology
    • C、The Technical and Delivery Assessment review actions were not executed
    • D、The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix

    正确答案:C

  • 第3题:

    A Business Partner has proposed an IBM System Storage DS8700 that will have several AIX, Windows, and Sun Solaris servers attached via SAN. The customer has asked for detailed documentation on the steps needed to install the latest adapter drivers.  What is the best document the Business Partner can suggest to accomplish this requirement()

    • A、the IBM System Storage DS8000 Interoperability Matrix
    • B、the IBM System Storage DS8000 Introduction and Planning Guide
    • C、the IBM System Storage DS8000 Host System Attachment Guide
    • D、the IBM System Storage DS8000 User’s Guide

    正确答案:C

  • 第4题:

    A customer has the need for performance monitoring of an IBM System Storage DS8000.  Which product does the customer need()

    • A、System Storage Productivity Center
    • B、Tivoli Storage Productivity Center for Data
    • C、Tivoli Storage Productivity Center for Disk
    • D、Tivoli Storage Productivity Center for Fabric

    正确答案:C

  • 第5题:

    An IBM Business Partner sells an IBM System Storage DS8700 to a customer.  Who is responsible for the installation and set up of the storage server()

    • A、purchasing customer
    • B、IBM Installation Readiness Team
    • C、IBM Customer Engineer
    • D、IBM Business Partner

    正确答案:C

  • 第6题:

    A customer wants to deploy a centralized storage system to support a new database. Which of the following factors should the storage specialist consider first?()

    • A、disaster recovery strategy
    • B、the number of IOPS required
    • C、the capacity of each hard drive
    • D、how the database will be backed up

    正确答案:B

  • 第7题:

    单选题
    A customer is interested in purchasing a new IBM System Storage TS3500 Tape Library. Which ofthe following documents should be used first to guide the Business Partner to verify theenvironment?()
    A

    TS3500 Redbook

    B

    TS3500 Operators Manual

    C

    Solution Assurance Product Review (SAPR) Guide

    D

    TS3500 Product Installation and Planning Guide


    正确答案: D
    解析: 暂无解析

  • 第8题:

    单选题
    A Business Partner has proposed an IBM System Storage DS8700 that will have several AIX, Windows, and Sun Solaris servers attached via SAN. The customer has asked for detailed documentation on the steps needed to install the latest adapter drivers.  What is the best document the Business Partner can suggest to accomplish this requirement()
    A

    the IBM System Storage DS8000 Interoperability Matrix

    B

    the IBM System Storage DS8000 Introduction and Planning Guide

    C

    the IBM System Storage DS8000 Host System Attachment Guide

    D

    the IBM System Storage DS8000 User’s Guide


    正确答案: C
    解析: 暂无解析

  • 第9题:

    单选题
    A customer is involved in an IBM critical situation (CritSit). The customer recently installed iDATAPIex. The business partner has been assessed a significant penalty by IBM. Which of the following is the reason for this action by IBM?()
    A

    The business partner was required to perform a TDA and failed to do so

    B

    The business partner recommended a nonworking configuration

    C

    The business partner did not support the customer correctly

    D

    The business partner failed to sell Remote Technical Support (RTS)


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    A customer has two DS8000 systems in their environment. One DS8000 has FlashCopy licensed while the other does not. The customer wishes to license FlashCopy on the second DS8000.  Which of the following describes the TDA requirement in this situation()
    A

    a pre-sale TDA is mandatory

    B

    a pre-install TDA is mandatory

    C

    a pre-install TDA is not mandatory since it is not FirstIn Customer Location (FICL)

    D

    both pre-sale and pre-install TDAs are mandatory


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()
    A

    capacity above 500 TB

    B

    first in customer location

    C

    a new model has been released

    D

    sold without implementation service


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    A customer has the need for performance monitoring of an IBM System Storage DS8000.  Which product does the customer need()
    A

    System Storage Productivity Center

    B

    Tivoli Storage Productivity Center for Data

    C

    Tivoli Storage Productivity Center for Disk

    D

    Tivoli Storage Productivity Center for Fabric


    正确答案: A
    解析: 暂无解析

  • 第13题:

    A customer is interested in purchasing a new IBM System Storage DS8000 solution to consolidateolder ESS and F20 storage systems. What should be done first, prior to final proposaldevelopment?()

    • A、perform a Disk Magic study 
    • B、review eConfig with a technical specialist 
    • C、confirm that the customer has enough ports available in the SAN infrastructure 
    • D、submit configuration to IBM System Storage Interoperability Center for validation

    正确答案:A

  • 第14题:

    A storage specialist is proposing a solution consisting of an IBM System Storage TS3200 TapeLibrary and a SAN Volume Controller, both of which are being added to a customer’s existing SANenvironment for the first time. Which of the following should be completed before the proposal ispresented to the customer?()

    • A、TDA
    • B、Capacity Magic
    • C、business case review
    • D、SAN configuration review

    正确答案:A

  • 第15题:

    While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?()

    • A、IBM DS5000 Cabling Tool
    • B、IBM e-Configurator Tool
    • C、IBM Pre-Installation TDA Checklist
    • D、IBM Standalone Solutions Configuration Tool

    正确答案:C

  • 第16题:

    An opportunity has been successfully won by a Business Partner in collaboration with IBM. Whohas responsibility for conducting the TDA process?()

    • A、the customer alone 
    • B、the Business Partner 
    • C、IBM and the customer 
    • D、the Business Partner and IBM jointly

    正确答案:B

  • 第17题:

    An IBM System x Technical Expert has a prospective customer who is very excited about X5 and they are working on configurations.   During the process the customer has changed the design numerous times and has significantly increased the scope.  They recently selected a Business Partner who has been involved in the last few design changes. What steps should be taken to make sure the customer is satisfied with the solution?()

    • A、Turn over current design to Techline to create configurations 
    • B、Perform knowledge transfer of design requirements to Business Partner then disengage 
    • C、Work with business partner to engage Techline to assist with configurations and request Technical and Delivery Assessment (TDA) 
    • D、Work with business partner to engage Techline to create configurations

    正确答案:C

  • 第18题:

    An IBM technician specialist has a prospective customer who is excited about eX5 and is working on configuration for a very large complex opportunity. During the engagement the customer has changed the design several times and has significantly increased the scope. The customers recently selected a Business Partner who has been involved in the last few design changes. What steps should the IBM technician specialist take to make sure the customer is satisfied with the solution?()

    • A、Turn over current design to Techline to create configurations
    • B、Perform knowledge transfer of design requirements to Business partner then disengage
    • C、Work with Business Partner to engage Techline to assist with configuration and request technical and Delivery Assessment (TDA)
    • D、Work with business partner to engage Techline to create configurations

    正确答案:C

  • 第19题:

    单选题
    An IBM technician specialist has a prospective customer who is excited about eX5 and is working on configuration for a very large complex opportunity. During the engagement the customer has changed the design several times and has significantly increased the scope. The customers recently selected a Business Partner who has been involved in the last few design changes. What steps should the IBM technician specialist take to make sure the customer is satisfied with the solution?()
    A

    Turn over current design to Techline to create configurations

    B

    Perform knowledge transfer of design requirements to Business partner then disengage

    C

    Work with Business Partner to engage Techline to assist with configuration and request technical and Delivery Assessment (TDA)

    D

    Work with business partner to engage Techline to create configurations


    正确答案: A
    解析: 暂无解析

  • 第20题:

    单选题
    An IBM Business Partner sells an IBM System Storage DS8700 to a customer.  Who is responsible for the installation and set up of the storage server()
    A

    purchasing customer

    B

    IBM Installation Readiness Team

    C

    IBM Customer Engineer

    D

    IBM Business Partner


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    An IBM System x Technical Expert has a prospective customer who is very excited about X5 and they are working on configurations.   During the process the customer has changed the design numerous times and has significantly increased the scope.  They recently selected a Business Partner who has been involved in the last few design changes. What steps should be taken to make sure the customer is satisfied with the solution?()
    A

    Turn over current design to Techline to create configurations 

    B

    Perform knowledge transfer of design requirements to Business Partner then disengage 

    C

    Work with business partner to engage Techline to assist with configurations and request Technical and Delivery Assessment (TDA) 

    D

    Work with business partner to engage Techline to create configurations


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()
    A

    The EMC storage specialist has not participated in the TDA meeting

    B

    The FC HBAs are 4 Gbps technology

    C

    The Technical and Delivery Assessment review actions were not executed

    D

    The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    An opportunity has been successfully won by a Business Partner in collaboration with IBM. Whohas responsibility for conducting the TDA process?()
    A

    the customer alone 

    B

    the Business Partner 

    C

    IBM and the customer 

    D

    the Business Partner and IBM jointly


    正确答案: A
    解析: 暂无解析

  • 第24题:

    单选题
    A customer wants to deploy a centralized storage system to support a new database. Which of the following factors should the storage specialist consider first?()
    A

    disaster recovery strategy

    B

    the number of IOPS required

    C

    the capacity of each hard drive

    D

    how the database will be backed up


    正确答案: A
    解析: 暂无解析