New install of AIX
Migrate the 7040-61D
Utilize alt_disk_install
Use the enterprise back up strategy
第1题:
Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()
第2题:
Companycom is migrating from p670 systems running AIX 5.2 to p5 595 systems running AIX 5.3. They will be changing out only the system units. They will re-use the existing 61D drawers and adapters with the new p5 595 systems. What compatibility issue must be considered?()
第3题:
Companycom is migrating their application that was built on AIX 4.3, to a new p5 590 system that is running AIX 5.3. The application was a 32-bit program. What will need to be done with the application to allow it to run on the new system?()
第4题:
Companycom has successfully established their p5 LPAR environment on a POWER5 p5 590 running AIX 5.2. They are now ready to move to Virtual IO. What would be required to do Virtual IO?()
第5题:
Companycom has a p5 595 running 12 LPARs. They are interested in high bandwidth, secure communication between two of the LPARs within the p5 595 server. They do not have any unused Ethernet adapters. Which of the following recommendations will best meet this requirement?()
第6题:
Utilize the integrated 10/100/1000 network interface
Implement Virtual Ethernet to enable inter-partition communication
Implement shared Ethernet with the Ethernet adapters utilized in the other LPARs
Implement a Point to Point protocol serial communication between the p5 595 serial ports
第7题:
The resources must be unallocated in an LPAR
The microcode on the pSeries must be current
All network adapters on the LPAR must be defined
Network connectivity and name resolution capability between HMC and LPARs
第8题:
Set up the server in SMP mode and use WLM to manage resources effectively
Set up eight dedicated LPARs and use DLPAR to manage resources effectively
Set up a shared pool with eight capped LPARs including production and test/dev
Set up a shared pool with eight uncapped LPARs with priority weight to Production
第9题:
Use alt_disk_install
Backup image to NIM server
Backup using mksysb to DVD-RAM
Apply the upgrade and do not commit
第10题:
APV features are not supported for some legacy POWER4 adapters
APV will require the most current maintenance level for AIX 5.2
APV features will require that legacy POWER4 adapters be updated with new microcode
The Virtual IO Server must run AIX 5.3 and the LPARs can run either AIX 5.2 or AIX 5.3
第11题:
Upgrade the p690 to a p5 590 server running AIX 5.3
Upgrade the p690 server to AIX 5.3 and implement Advanced Power Virtualization
Purchase a p5 590 with minimum resources and simply reuse the p690 unused fiber HBA adapters
Purchase a p5 590 that has all the needed resources and adapters for Advanced Power Virtualization
第12题:
New install of AIX
Migrate the 7040-61D
Utilize alt_disk_install
Use the enterprise back up strategy
第13题:
A customer has an 8-way p5-570 with eight internal disk drives and AIX 5.2. Which of the following must be added, if anything, to the configuration to support four LPARs, assuming each LPAR requires twodisk drives?()
第14题:
Companycom has seven days of vmstat data on a p5 590. The server has a total of four test/dev LPARs and 4 production LPARs of one processor each. On the four test/dev LPARs, the data shows 90-95% peak utilizations with a duration of from 5 to 10 minutes. The average utilizations of all LPARs were between 15-30%. All of the applications have different times when they peak. What is the best configuration to fully utilize the processor resource?()
第15题:
Companycom has a p690 server with unused fiber (HBA) host bus adapters (feature code 6228) that they would like to reuse. They are interested in implementing Advanced Power Virtualization features particularly Virtual IO. What is the best way to proceed?()
第16题:
Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux. Which of the following would be the best solution to recommend?()
第17题:
APV, AIX5.2ML4
AIX5.3 or i5/OS
APV, i5/OS, AIX5.3
APV, AIX5.3 or SuSE9
第18题:
Apply APAR IY62262 to the current AIX 5.2 Maintenance level 04. Virtual IO Server is not required.
Purchase Advanced POWER Virtualization software, upgrade to AIX 5.3 maintenance level 1 and apply APAR IY60349. Virtual IO Server is not required.
Verify that there are enough resources to add a Virtual IO Server, upgrade to AIX 5.3 with APAR IY60349, create a Virtual IO Server after applying APAR IY62262.
Verify that there are enough resources to add a Virtual IO Server, create a Virtual IO Server and apply APAR IY62262, verify that the system is at AIX 5.2 with Maintenance level 04.
第19题:
New install of AIX
Migrate the 7040-61D
Utilize alt_disk_install
Use the enterprise back up strategy
第20题:
7311-D20 drawer with four disks
Upgrade to AIX 5.3
Fiber adapters to attach to SAN
Nothing
第21题:
One single port Ethernet adapter
Four dual port Ethernet adapters
Two single port Ethernet adapters
Eight single port Ethernet adapters
第22题:
Assign the adapter to an IO Hosting partition
Use AIX 5L affinity to move the application from SUSE to AIX
Use AIX 5.3 drivers to install the adapter in the Linux LPAR
Assign the adapter to an AIX 5.3 partition running Linux Affinity
第23题:
Run without recompiling on AIX 5.3
Relink to the 32-bit kernel in order to run the application
Recompile to run on AIX 5.3 because the libraries are in different locations
Recompile 32-bit applications because the compiler flags and versions have changed
第24题:
Use AIX 5.3 which supports micro-partitioning for both the test and training LPARS
Use DLPAR to move resources from the test LPAR to training when training is active
Install Partition Load Manager to share resources between the test and training environments
Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs