175 Response Planning is the responsibility of the functional areas and considers
A. mitigation.
B. deflection.
C. contingency planning.
D. unforeseen occurrences.
E. All of the above
第1题:
Satisfaction of the functional requirements of a product is called _____ .
A . usability
B . reliability
C . maintainability
D . producibility
E . All of the above.
第2题:
Range estimating in determining cost risk probabilities requires _____ .
A an amount of financial exposure.
B risks and opportunities ranked in order of bottom line importance
C contingency requirements for expected level of confidence
D probability of cost overrun occurrences
E All of the above.
第3题:
Contingency planning should include all but which of the following?
A The development of a contingency allowance determined by combining (layering) various estimate segments to form. larger estimate segments.
B the development of schedule alternatives and work-around
C the management of a contingency budget
D an assessment of project shut-down liabilities.
E A and C
第4题:
Management reserve is generally intended to be used to:
A implement additional unbudgeted scope
B compensate for inaccurate estimates
C cover major unforeseen catastrophes
D cover unforeseen problems in the project
E All of the above.
第5题:
34 Planning activities such that predetermined resource availability pools are not exceeded is called: A. Resource leveling.
B. Manpower leveling.
C. Resource limited planning.
D. Manpower planning.
E. Manpower contingency planning
第6题:
1 Contingency planning should include all but which of the following?
A. The development of a contingency allowance determined by combining (layering) various estimate segments to form. larger estimate segments.
B the development of schedule alternatives and work-around
C. the management of a contingency budget
D. an assessment of project shut-down liabilities.
E. A and C
第7题:
93 Response Planning is the responsibility of the functional areas and considers
A. mitigation.
B. deflection.
C. contingency planning.
D. unforeseen occurrences.
E. All of the above
第8题:
142 Ensuring that all work is both authorized and funded by contractual documentation is the responsibility of:
A. The project manager
B. The functional manager
C. The project sponsor
D. The client
E. All of the above
第9题:
18 Interfacing with the customer after project go-ahead is the responsibility of:
A. Project sponsor
B. Project team
C. Project manager
D. Functional manager
E. All of the above are possible, based upon the size and complexity of the project
第10题:
● Interfacing with the customer after project go-ahead is the responsibility of:
A Project sponsor
B Project team
C Project manager
D Functional manager
E All of the above are possible, based upon the size and complexity of the project
第11题:
● Ensuring that all work is both authorized and funded by contractual documentation is the responsibility of:
A The project manager
B The functional manager
C The project sponsor
D The client
E All of the above
第12题:
It is the responsibility of the crane operator to, at all times, be aware of the location of the __.
A.load
B.hook
C.boom
D.All of the above
第13题:
The main player in project communication is the
A sponsor
B project manager
C functional manager
D functional team
E All of the above.
第14题:
Response Planning is the responsibility of the functional areas and considers
A mitigation.
B deflection.
C contingency planning.
D unforeseen occurrences.
E All of the above.
第15题:
Which of the following areas are addressed in risk identification:
A environmental
B technical
C legal
D All of the above.
E A and B only
第16题:
136 Management reserve is generally intended to be used to:
A. implement additional unbudgeted scope
B. compensate for inaccurate estimates
C. cover major unforeseen catastrophes
D. cover unforeseen problems in the project
E. All of the above
第17题:
92 The main player in project communication is the
A. sponsor
B. project manager
C. functional manager
D. functional team
E. All of the above
第18题:
61 The document authorizing functional areas to charge against the project is the:
A. Work authorization form.
B. Scope baseline
C. Project charter
D. Management plan
E. Linear responsibility chart
第19题:
138 Satisfaction of the functional requirements of a product is called _____ .
A. usability
B. reliability
C. maintainability
D. producibility
E. All of the above
第20题:
116 Planning activities such that predetermined resource availability pools are not exceeded is called: A. Resource leveling.
B. Manpower leveling.
C. Resource limited planning.
D. Manpower planning.
E. Manpower contingency planning.
第21题:
● During the planning phase of a project, you realize that more than one functional department possesses the skill and technical know-how to perform. a given task. The best way for the project manager to handle this would be to:
A Make the decision, document it in the linear responsibility chart, and distribute the chart to all departments.
B Let the affected line groups decide among themselves who will perform. the work
C Ask the executive sponsor to make the decision
D Allow each line group to perform. part of the task
E All of the above
第22题:
● A summary WBS is usually developed in the
A Conceptual phase
B implementation phase
C planning phase
D close-out phase
E All of the above phases
第23题:
● The document authorizing functional areas to charge against the project is the:
A Work authorization form
B Scope baseline
C Project charter
D Management plan
E Linear responsibility chart