93 Response Planning is the responsibility of the functional areas and considersA. mitigation.B. deflection.C. contingency planning.D. unforeseen occurrences.E. All of the above

题目

93 Response Planning is the responsibility of the functional areas and considers

A. mitigation.

B. deflection.

C. contingency planning.

D. unforeseen occurrences.

E. All of the above


相似考题
更多“93 Response Planning is the responsibility of the functional areas and considersA. mitigation.B. deflection.C. contingency planning.D. unforeseen occurrences.E. All of the above”相关问题
  • 第1题:

    Satisfaction of the functional requirements of a product is called _____ .

    A . usability

    B . reliability

    C . maintainability

    D . producibility

    E . All of the above.


    正确答案:E

  • 第2题:

    Range estimating in determining cost risk probabilities requires _____ .

    A an amount of financial exposure.

    B risks and opportunities ranked in order of bottom line importance

    C contingency requirements for expected level of confidence

    D probability of cost overrun occurrences

    E All of the above.


    正确答案:E

  • 第3题:

    Contingency planning should include all but which of the following?

    A The development of a contingency allowance determined by combining (layering) various estimate segments to form. larger estimate segments.

    B the development of schedule alternatives and work-around

    C the management of a contingency budget

    D an assessment of project shut-down liabilities.

    E A and C


    正确答案:A

  • 第4题:

    Management reserve is generally intended to be used to:

    A implement additional unbudgeted scope

    B compensate for inaccurate estimates

    C cover major unforeseen catastrophes

    D cover unforeseen problems in the project

    E All of the above.


    正确答案:D

  • 第5题:

    34 Planning activities such that predetermined resource availability pools are not exceeded is called: A. Resource leveling.

    B. Manpower leveling.

    C. Resource limited planning.

    D. Manpower planning.

    E. Manpower contingency planning


    正确答案:C

  • 第6题:

    1 Contingency planning should include all but which of the following?

    A. The development of a contingency allowance determined by combining (layering) various estimate segments to form. larger estimate segments.

    B the development of schedule alternatives and work-around

    C. the management of a contingency budget

    D. an assessment of project shut-down liabilities.

    E. A and C


    正确答案:A

  • 第7题:

    138 Satisfaction of the functional requirements of a product is called _____ .

    A. usability

    B. reliability

    C. maintainability

    D. producibility

    E. All of the above


    正确答案:E

  • 第8题:

    175 Response Planning is the responsibility of the functional areas and considers

    A. mitigation.

    B. deflection.

    C. contingency planning.

    D. unforeseen occurrences.

    E. All of the above


    正确答案:E

  • 第9题:

    18 Interfacing with the customer after project go-ahead is the responsibility of:

    A. Project sponsor

    B. Project team

    C. Project manager

    D. Functional manager

    E. All of the above are possible, based upon the size and complexity of the project


    正确答案:C

  • 第10题:

    ● Interfacing with the customer after project go-ahead is the responsibility of:

    A Project sponsor

    B Project team

    C Project manager

    D Functional manager

    E All of the above are possible, based upon the size and complexity of the project


    正确答案:C

  • 第11题:

    ● Ensuring that all work is both authorized and funded by contractual documentation is the responsibility of:

    A The project manager

    B The functional manager

    C The project sponsor

    D The client

    E All of the above


    正确答案:A

  • 第12题:

    It is the responsibility of the crane operator to, at all times, be aware of the location of the __.

    A.load

    B.hook

    C.boom

    D.All of the above


    正确答案:D
    吊车驾驶员的责任是在任何时候都要了解到货物、吊钩、吊杆的位置。

  • 第13题:

    The main player in project communication is the

    A sponsor

    B project manager

    C functional manager

    D functional team

    E All of the above.


    正确答案:B

  • 第14题:

    Response Planning is the responsibility of the functional areas and considers

    A mitigation.

    B deflection.

    C contingency planning.

    D unforeseen occurrences.

    E All of the above.


    正确答案:E

  • 第15题:

    Which of the following areas are addressed in risk identification:

    A environmental

    B technical

    C legal

    D All of the above.

    E A and B only


    正确答案:D

  • 第16题:

    136 Management reserve is generally intended to be used to:

    A. implement additional unbudgeted scope

    B. compensate for inaccurate estimates

    C. cover major unforeseen catastrophes

    D. cover unforeseen problems in the project

    E. All of the above


    正确答案:D

  • 第17题:

    92 The main player in project communication is the

    A. sponsor

    B. project manager

    C. functional manager

    D. functional team

    E. All of the above


    正确答案:B

  • 第18题:

    61 The document authorizing functional areas to charge against the project is the:

    A. Work authorization form.

    B. Scope baseline

    C. Project charter

    D. Management plan

    E. Linear responsibility chart


    正确答案:A

  • 第19题:

    142 Ensuring that all work is both authorized and funded by contractual documentation is the responsibility of:

    A. The project manager

    B. The functional manager

    C. The project sponsor

    D. The client

    E. All of the above


    正确答案:A

  • 第20题:

    116 Planning activities such that predetermined resource availability pools are not exceeded is called: A. Resource leveling.

    B. Manpower leveling.

    C. Resource limited planning.

    D. Manpower planning.

    E. Manpower contingency planning.


    正确答案:C

  • 第21题:

    ● During the planning phase of a project, you realize that more than one functional department possesses the skill and technical know-how to perform. a given task. The best way for the project manager to handle this would be to:

    A Make the decision, document it in the linear responsibility chart, and distribute the chart to all departments.

    B Let the affected line groups decide among themselves who will perform. the work

    C Ask the executive sponsor to make the decision

    D Allow each line group to perform. part of the task

    E All of the above


    正确答案:B

  • 第22题:

    ● A summary WBS is usually developed in the

    A Conceptual phase

    B implementation phase

    C planning phase

    D close-out phase

    E All of the above phases


    正确答案:A

  • 第23题:

    ● The document authorizing functional areas to charge against the project is the:

    A Work authorization form

    B Scope baseline

    C Project charter

    D Management plan

    E Linear responsibility chart


    正确答案:A