146 The five major cost categories of quality are _____ .A. prevention, appraisal, internal failures, external failures, and equipment (measurement and test). B. specifications, QA programs, QC programs, parts rejected and parts returnedC. Staffing, Train

题目

146 The five major cost categories of quality are _____ .

A. prevention, appraisal, internal failures, external failures, and equipment (measurement and test). B. specifications, QA programs, QC programs, parts rejected and parts returned

C. Staffing, Training, reviews, equipment and rejected goods

D. sampling, design considerations, manufacturing considerations, training and rework.

E. None of the above


相似考题
更多“146 The five major cost categories of quality are _____ .A. prevention, appraisal, internal failures, external failures, and equipment (measurement and test). B. specifications, QA programs, QC programs, parts rejected and parts returnedC. Staffing, Train”相关问题
  • 第1题:

    Which of the following statements about the cost of quality are true?

    A . the cost of quality is the expense of nonconformance to requirements and specifications.

    B . the cost of quality are mostly the direct responsibility of workers who are manufacturing the product.

    C . quality control programs should be implemented when the cost of quality are deemed affordable by management.

    D . A and B.

    E . A and C


    正确答案:A

  • 第2题:

    132 A proven effective means to insure quality conformance is to:

    A. delegate accountability to subordinates

    B. revise quality specifications to match quality measurements

    C. train workers in proper quality methods

    D. inspect quality into the product

    E. make quality a higher priority than cost or schedule


    正确答案:C

  • 第3题:

    150 Cost of quality includes:

    A. Appraisal cost

    B. detection cost

    C. prevention cost

    D. maintenance cost

    E. A, B, and C only


    正确答案:E

  • 第4题:

    28 The five major cost categories of quality are _____ .

    A. prevention, appraisal, internal failures, external failures, and equipment (measurement and test). B. specifications, QA programs, QC programs, parts rejected and parts returned

    C. Staffing, Training, reviews, equipment and rejected goods

    D. sampling, design considerations, manufacturing considerations, training and rework.

    E. None of the above


    正确答案:A

  • 第5题:

    ● (73)is the application of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements.

    (73)

    A. Quality assurance (QA)

    B. Quality planning

    C. Quality control (QC)

    D. Quality costs


    正确答案:A

  • 第6题:

    ● ()is the application ion of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements.()A. Quality assurance (QA) B. Quality planningC. Quality control (QC) D. Quality costs


    正确答案:A
    质量保证是一项有计划的、系统的质量活动,以确保项目的所有过程达到并符合要求。

  • 第7题:

    ______ is a set of specifications and software that allow small programs or software components to work together.

    A.ActiveX

    B.XML

    C.HTML

    D.DBMS


    正确答案:A
    解析:译文的含义是:()是一组规范和软件的集合,使得小程序或软件组件可以协同工作。选项B的含义是扩展标记语言,选项C的含义是超文本标记语言,选项D的含义是数据库管理系统。只有选项A符合题意。

  • 第8题:

    ActiveX is a set of specifications and software that allow small programs or software components to(72).

    A.work together

    B.work alone

    C.simplify

    D.reuse


    正确答案:A
    解析:ActiveX技术包括一个规范集和一些能使小程序和软件组件在一起运行的软件。

  • 第9题:

    Which of the following is not part of a modem quality management concept?(74)

    A.Performance standard is zero defects

    B.Quality must be inspected in

    C.85% of failures occur because of the process, not the worker

    D.Quality is a 4 cycle process plan/do/check/act


    正确答案:B
    解析:A、C、D是经典质量理论,只有B不是。

  • 第10题:

    产品发布后,修改客户发现缺陷所引起的成本属于下列哪项成本()

    • A、内部缺陷成本(Internal Failure Cost)
    • B、评估成本(Appraisal Cost)
    • C、外部缺陷成本(External Failure Cost)
    • D、客户满意成本(Customer Satisfaction)

    正确答案:C

  • 第11题:

    单选题
    产品发布后,修改客户发现缺陷所引起的成本属于下列哪项成本()
    A

    内部缺陷成本(Internal Failure Cost)

    B

    评估成本(Appraisal Cost)

    C

    外部缺陷成本(External Failure Cost)

    D

    客户满意成本(Customer Satisfaction)


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    By saying “... but the impact of a degree washes out after five years” (Line 3, Para.3), the author means _____.
    A

    most MBA programs fail to provide, students with a solid foundation

    B

    an MBA degree does not help promotion to managerial positions

    C

    MBA programs will not be as popular in five years’ time as they are now

    D

    in five years people will forget about the degree the MBA graduates have got


    正确答案: C
    解析:
    语义题。这句话的意思为“MBA毕业生所得学位的影响5年后就消失了”,这与D项“5年后人们就会忘掉MNA毕业生所获得的学位”属同义转述,故D为答案。

  • 第13题:

    16 Which of the following statements about the cost of quality are true?

    A. the cost of quality is the expense of nonconformance to requirements and specifications.

    B. the cost of quality are mostly the direct responsibility of workers who are manufacturing the product. C. quality control programs should be implemented when the cost of quality are deemed affordable by management.

    D. A and B.

    E. A and C


    正确答案:A

  • 第14题:

    124 Warranty cost is an example of an _____ .

    A. internal failure cost

    B. appraisal cost

    C. external failure cost

    D. customer satisfaction cost

    E. All of the above


    正确答案:C

  • 第15题:

    98 Which of the following statements about the cost of quality are true?

    A. the cost of quality is the expense of nonconformance to requirements and specifications.

    B. the cost of quality are mostly the direct responsibility of workers who are manufacturing the product.

    C. quality control programs should be implemented when the cost of quality are deemed affordable by management.

    D. A and B.

    E. A and C


    正确答案:A

  • 第16题:

    产品发布后,修改客户发现缺陷所引起的成本属于下列哪项成本()

    A.内部缺陷成本(Internal Failure Cost)

    B.评估成本(Appraisal Cost)

    C.外部缺陷成本(External Failure Cost)

    D.客户满意成本(Customer Satisfaction)


    参考答案:C

  • 第17题:

    (b) The management of Division C has identified the need to achieve cost savings in order to become more

    competitive. They have decided that an analysis and investigation of quality costs into four sub-categories will

    provide a focus for performance measurement and improvement.

    Required:

    Identify the FOUR sub-categories into which quality costs can be analysed and provide examples (which

    must relate to Division C) of each of the four sub-categories of quality cost that can be investigated in order

    that overall cost savings might be achieved and hence the performance improved. (8 marks)


    正确答案:
    (b) Quality costs may be monitored by measuring costs of non-conformance and costs of conformance.
    Costs of non-conformance occur when the product fails to reach the design quality standards. Such costs may be subdivided
    into internal failure costs and external failure costs.
    Internal failure costs occur when the failure is detected before the transfer of the product to the customer.
    External failure costs occur when the failure to reach the required standards is not detected until after the product has been
    transferred to the customer.
    Costs of conformance are those incurred in reducing or eliminating the costs of non-conformance. Such costs may be
    subdivided into appraisal costs and prevention costs.
    Appraisal costs are those associated with the evaluation of items such as purchased material and services in order to ensure
    that they conform. to the agreed specification.
    Prevention costs are those associated with the implementation of a quality improvement programme. Such costs are planned
    in advance and their implementation should lead to continuous improvement.
    Examples of quality costs relevant to Division C may include:
    Internal failure costs: cost of materials scrapped due to poor receipt and storage procedures or losses of CC output due to poor
    processing routines.
    External failure costs: cost of quality problems with batch of CC not detected until it has reached Division B. This may require
    free replacement of the batch and compensation for loss of output by Division B.
    Appraisal costs: evaluation of purchased material and services in relation to the manufacture of CC to ensure that it conforms
    to the agreed specification; e.g. inspection and testing before use.
    Prevention costs: the cost of implementation of staff training and the costs of equipment testing to ensure that it conforms to
    the specification standards required for the production of CC.
    (Alternative relevant examples would be accepted)

  • 第18题:

    Unluckily some Quality Management System failures()headlines.

    A. do make

    B. does make

    C. do not make


    答案:A

    解析:本句意思:不幸的是,一些质量管理系统的失败成为了头条新闻。do not make healines意思是并没有成为头条新闻,与前面unluckily“不幸的”意思不符,所以不选C;some+名词+谓语动词结构,谓语动词的单复数要跟结构中名词单复数形式保持一致,所以选A。

  • 第19题:

    The UNIX operating system is made up of three parts; the kernel, the shell and the programs. The kernel of UNIX is the(71)of the operating system: it allocates time and memory to programs and handles the filestore and communications in response to(72). The shell acts as an(73)between the user and the kernel. When a user logs in, the(74)program checks the username and password, and then starts another program called the shell. The shell is a command line(75)(CLI). It interprets the commands the user types in and arranges for them to be carded out. The commands are themselves programs: when they terminate, the shell gives the user another prompt(% on our systems).

    A.hub

    B.center

    C.core

    D.nucleus


    正确答案:A
    解析:hub:中心

  • 第20题:

    Which two kinds of failures make the Data Recovery Advisor (DRA)generate a manual checklist? ()

    A. failures because a data file is renamed by error

    B. failures when no standby database is configured

    C. failures that require no archive logs to be applied for recovery

    D. failures due to loss of connectivity-for example, an unplugged disk cable


    参考答案:A, D

  • 第21题:

    ( ) is the application of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements.

    A.Quality assurance(QA)
    B.Quality planning
    C.Quality control(QC)
    D.Quality costs

    答案:A
    解析:
    质量计划是质量管理的一部分,致力于制定质量目标,并规定必要的运行过程和相关资源以实现项目质量目标。
    质量控制就是项目团队的管理人员采取有效措施,监督项目的具体实施结果,判断它们是否符合项目有关的质量标准,并消除产生不良结果原因的途径。
    质量成本是指为满足质量要求所付出的主要成本。
    质量保证是通过对质量计划的系统实施,确保项目需要的相关过程达到预期要求的质量活动。选项A是质量保证(QA),选项B是质量计划,选项C是质量控制(QC),选项D是质量成本。因此应选择A。

  • 第22题:

    Which two kinds of failures make the Data Recovery Advisor (DRA)generate a manual checklist? ()

    • A、failures because a data file is renamed by error
    • B、failures when no standby database is configured
    • C、failures that require no archive logs to be applied for recovery
    • D、failures due to loss of connectivity-for example, an unplugged disk cable

    正确答案:A,D

  • 第23题:

    单选题
    The major cause of anchor buoy pendant wire failures is().
    A

    corrosion

    B

    rough weather

    C

    defective sockets

    D

    mishandling


    正确答案: D
    解析: 暂无解析