当前分类: IBM(000-238)
问题:单选题A customer is putting together a high-performance computing cluster of p655 nodes. They need a total of 48 processors and want to get the best performance possible out of those systems. They are evaluating four options and have asked the pSeries tech...
查看答案
问题:单选题A customer has just obtained a second data center through the acquisition of a competitor. The IT Director is now seeking to merge,integrate,and rebalance systems across the two data centers over thenext two years. They have just deployed a high-sp...
问题:单选题A researcher needs to regularly analyze large quantities of data. They are interested in putting together a cluster of 16 UDB EEE partitions of four processors each for their data mining environment. Each UDB partition needs to be approximately 15 rP...
问题:单选题A customer is getting ready to install a new pSeries system into their data center. They are concerned about providing the appropriate clearance around their 7014-T42 to allow for maintenance. What reference material should the pSeries technical spec...
问题:单选题Which of the following best describes Simultaneous Multi-threading (SMT)?()A A POWER5 microprocessor feature that allocates two processors to each applicationB A Workload Manager feature that allows two processing threads to be executing on a single pr...
问题:单选题A customer has an existing SP system and needs to add cards to some of the nodes. Which of the following applications must be used to configure the upgrade?()A MRPDPlus toolB Inventory ServicesC PCRS6000 Portable ConfiguratorD eConfig - IBM Configurat...
问题:单选题What is a key advantage of the POWER5 technology over all other competitive offerings?()A POWER5 supports multiple operating systems.B POWER5 supports more nodes in a clustered environment.C POWER5 hypervisor has significantly less overhead than hardwa...
问题:单选题The pSeries technical specialist has a number of tasks to perform and does not have time to do them all. It is a week before the end of quarter and the account executives all state that their individual requests are the highest priority. How should t...
问题:单选题A customer has requested a proposal for a p5-520 with AIX 5.2 and Sysback. There are no plans to run LPARs or Micro-Partitions on the p5-520 in the near future. The customer has asked the pSeries technical specialist to recommend anything else that m...
问题:单选题Which of the following benchmarking ratings cover essentially the same performance metrics associated with commercial applications for IBM UNIX systems?()A AB BC CD D...
问题:单选题A customer is planning to migrate a financial application to a 12-way p5-570 system with 96GB of memory. The application data is stored on an ESS Model 800 attached to a p670 server with AIX 5.2. They will have a short outage window to perform the da...
问题:单选题What is the minimum number of p5-570 building blocks required to support 16 RIO drawers?()A 1B 2C 3D 4...
问题:单选题Which of the following is the most cost effective required solution to support the boot disks internally for two partitions on a p5-520 running AIX 5.3 without the Advanced Virtualization feature?()A Optional 4-packB 7311-D20 RIO drawerC Optional 4-pac...
问题:单选题A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers. The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server. How can the specialist help the ...
问题:单选题Which of the following lists of items all require an HMC to function with POWER5?()A Running AIX 5.3 Implementing HACMP Implementing Static LPARB Implementing Advanced POWER Virtualization Running Linux Attaching RIO drawersC Implementing VIO Server Im...
问题:单选题A p5-570 8-way 32GB system has been proposed to a customer as a new test system with four LPARs. The current applications are certified on AIX 5.2 but not yet on AIX 5.3. The customer wants to understand the advantages and disadvantages of this solut...
问题:单选题AIX 5L v5.3 provides initial support for which of the following new features?()A Workload Manager,POWER5 supportB 64-bit kernel support,JFS2 supportC Dynamic LPAR,Capacity upgrade on demandD Micro-Partitioning,Virtual I/O Server...
问题:单选题What is the main reason for doing a Solutions Assurance Review with the customer? ()A To revalidate the total solutionB To overcome objections to the solutionC To review the pricing with the customerD To ensure the customer has the correct applications...
问题:单选题A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system. How might the pSeries technical specialist aid the customer in addressing their concern?()A Direct the ...